FIELD: metallurgy.
SUBSTANCE: preliminary external and internal calibration of pipe edges is performed for type of pipes connection. Then accessories are installed on both pipe edges, using them the pipe is rotated, upon the external surface protecting against external contacts, then hydrodynamic cleaning of the internal and external pipe surfaces are cleaned. The thermal cleaning of the specified pipe surfaces is performed in the furnace at temperature 390-420°C, then are held for one hour, then heated pipe is subjected to the mechanical cleaning by the abrasive out of the furnace ensuring specified roughness of the pipe surfaces. To the external and internal pipe surfaces the primer layer is applied with further drying at room temperature, at that the pipe using the accessories is rotated, then the pipe is heated in the furnace to temperature of the powder layer of the corrosion-resistant coating application, and the mentioned coating is applied simultaneously on the external and internal pipe surfaces. Then the layer polymerisation of the mentioned coating is performed by the pipe heating in the furnace, that is rotated, and further cooling by water/air mixture is performed.
EFFECT: reliable and long-time protective coating due to increased corrosion resistance of pipes, by increased quality of cleaning of the pipe surfaces and coating application to the pipe surfaces.
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR FORMING ROUGHE PROTECTIVE POLYMER COATING ON CASING PIPE | 2015 |
|
RU2633206C2 |
METHOD OF HEATING OF LONG ITEMS, SUCH AS STEEL PIPES, AND POWDER COATING POLYMERISATION IN FURNACE | 2013 |
|
RU2542244C1 |
METHOD FOR APPLICATION OF COATINGS ON TUBING STRING | 2019 |
|
RU2735438C1 |
METHOD OF COMPLEX CORROSION PROTECTION OF EXTENDED STEEL PIPE LINES (VERSIONS) | 2005 |
|
RU2296817C2 |
STEEL PIPES WITH PROTECTIVE POLYMER COATING MANUFACTURING METHOD | 2016 |
|
RU2666714C2 |
CONNECTION METHOD OF PIPES TO INNER AND OUTER COATINGS, AND DEVICE FOR ITS IMPLEMENTATION | 2012 |
|
RU2485386C1 |
APPLICATION OF OUTER THREE-LAYER COATING ON HEADER PIPE | 2014 |
|
RU2559621C1 |
PROCEDURE FOR APPLICATION OF INSULATING COLLAR ON PIPE COUPLING | 2008 |
|
RU2397404C1 |
METHOD OF OBTAINING PROTECTIVE COMPOSITE THERMOPLASTIC COATING AND METHOD OF THEREOF APPLICATION | 2014 |
|
RU2562267C1 |
METHOD FOR OBTAINING ELECTRON-RAY MODIFIED POLYMER COATING ON A STEEL PIPE AND STEEL PIPE WITH ELECTRON-RAY MODIFIED POLYMER COATING | 2017 |
|
RU2673921C1 |
Authors
Dates
2015-06-20—Published
2013-12-09—Filed