FIELD: process engineering.
SUBSTANCE: proposed process consists in taking fluid sample from pipeline by adjusting the fluid flow rate with the help of sampling shutoff valve fitted at the pipeline. Then, sample is forced into sample intake by jet via one pipe of two pipes fitted in/on sample intake wall or in neck or via one of two channels in its casing. Medium substituted with sample that fills said sample intake before sampling is derived from said sampler via another pipe of said two pipes or the other said channel. Note here that before forcing said sample to sample intake, it is additionally forced via extra pipe or drained there through into extra tank. Before or after pumping or draining of sample to shutoff valve said sample intake is connected by joint which rules out disconnection or seal failure at filling said sample intake with sample. Then, one or more point samples are taken into sample intake by displacement of filling medium to extra tank or pipeline. For this, sample the entire flow or its part in amount of at least tenfold volume of shutoff vale volume is tapped and directed into sample intake. For such sample flow redirection shutoff valve is used. Sample intake filled with sample, it is closed. Simultaneously, said extra pipe and pipe delivering said sample into sample intake are intercommunicated.
EFFECT: more representative sample.
2 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF COLLECTING LIQUID SAMPLES FROM PIPELINE AND APPARATUS FOR REALISING SAID METHOD | 2010 |
|
RU2457459C1 |
METHOD FOR TAKING SAMPLES FROM PIPELINE AND DEVICE FOR REALIZATION OF SAID METHOD | 2004 |
|
RU2286557C2 |
METHOD OF SAMPLING FLUID FROM GAS-LIQUID FLOW IN PIPELINE AND DEVICE FOR ITS IMPLEMENTATION | 2014 |
|
RU2616780C2 |
ARRANGEMENT METHOD OF FLUID PUMPING ELEMENT IN PIPELINE, AND DEVICE FOR ITS IMPLEMENTATION | 2010 |
|
RU2460934C2 |
METHOD AND DEVICE FOR SAMPLING LIQUID FROM PIPELINE | 2005 |
|
RU2309391C2 |
METHOD FOR SAMPLING DEMIXING-PRONE MEDIA AND DEVICE THEREFOR | 2014 |
|
RU2580724C2 |
METHOD OF ACCOMMODATING FLUID PUMP IN PIPE AND DEVICE TO THIS END | 2010 |
|
RU2444674C2 |
SAMPLING METHOD OF FLUID SAMPLES FROM PIPELINE, AND DEVICE FOR ITS IMPLEMENTATION | 2010 |
|
RU2456571C2 |
METHOD TO DETERMINE WORKING PARAMETERS OF GAS-LIQUID FLOW IN PIPELINE AND DEVICE FOR ITS REALISATION | 2009 |
|
RU2485453C2 |
METHOD FOR ARRANGEMENT OF FLUID PUMPING ELEMENT IN PIPELINE, AND DEVICE FOR ITS IMPLEMENTATION | 2010 |
|
RU2466374C2 |
Authors
Dates
2015-08-20—Published
2014-06-18—Filed