DOUBLE-TUBING STRING INSTALLATION FOR DUAL OPERATION OF TWO STRATA WITH ONE WELL Russian patent published in 2015 - IPC E21B43/14 E21B37/06 

Abstract RU 2566844 C1

FIELD: oil and gas industry.

SUBSTANCE: installation includes main and auxiliary drives, a packer set between the top and bottom producing formations, the main well interconnected with over-packer space of and auxiliary well interconnected with below-packer space, tubing strings with sucker-rod pumps fixed at the well mouth with dual string fittings, parallel anchor set at both tubing strings and designed to be fixed in regard to each other. At that recovery of product from the below producing formation is carried out by a tubing pump with an opening in the middle of cylinder and plunger, which length is less than length of the cylinder half.

EFFECT: more reliable operation of the installation.

2 dwg

Similar patents RU2566844C1

Title Year Author Number
DUAL TUBING INSTALLATION FOR SELECTIVE COMPLETION OF TWO RESERVOIRS BY ONE WELL 2022
  • Belov Aleksandr Evgenevich
RU2790622C1
INSTALLATION FOR SIMULTANEOUS SEPARATE OPERATION OF TWO FORMATIONS BY ONE WELL IN CONDITIONS COMPLICATED BY HIGH VISCOSITY OF PRODUCT OF UPPER FORMATION 2024
  • Belov Aleksandr Evgenevich
RU2826680C1
INSTALLATION OF SUCKER-ROD PUMP WITH PARALLEL PIPE STRINGS FOR OPERATION OF WELLS WITH INCREASED SAND PRODUCTION 2023
  • Bragin Dmitrii Viktorovich
  • Zairov Bulat Foatovich
  • Basos Georgii Iurevich
RU2815669C1
UNIT FOR SIMULTANEOUS SEPARATE PRODUCTION AND INJECTION UNDER CONDITIONS COMPLICATED BY HIGH VISCOSITY OF PRODUCT OF UPPER FORMATION 2023
  • Belov Aleksandr Evgenevich
RU2819182C1
PUMP UNIT FOR SIMULTANEOUS SEPARATE OPERATION OF TWO FORMATIONS IN WELL WITH INCREASED GAS FACTOR 2024
  • Akhmetshin Ruslan Alfredovich
RU2825381C1
WELL PUMPING UNIT FOR SIMULTANEOUS SEPARATE DEVELOPMENT OF TWO RESERVOIRS IN WELL 2010
  • Sharikov Gennadij Nesterovich
  • Kormishin Evgenij Grigor'Evich
  • Gafijatullin Khalil Khafizovich
  • Kurbangaleev Il'Dar Zaljalitdinovich
RU2427705C1
DUAL STRING PRODUCTION METHOD IN WELL WITH INCREASED GAS RATIO AND DEVICE FOR ITS IMPLEMENTATION 2012
  • Galaj Mikhail Ivanovich
  • Tret'Jakov Dmitrij Leonidovich
  • Demjanenko Nikolaj Aleksandrovich
  • Goshkis Vladimir Davidovich
  • Tsybrankov Aleksandr Nikolaevich
RU2513566C2
BOREHOLE PUMP UNIT FOR SIMULTANEOUS OPERATION OF TWO BEDS WITH GAS BYPASS FROM UNDER PARKER SPACE (VERSIONS) 2011
  • Aminev Marat Khusnullovich
  • Lukin Aleksandr Vladimirovich
RU2464413C1
WELL PUMPING UNIT FOR SIMULTANEOUS SEPARATE DEVELOPMENT OF TWO RESERVOIRS 2008
  • Alekseev Mikhail Aleksandrovich
  • Bychkov Nikolaj Aleksandrovich
  • Baldina Tat'Jana Rehmovna
  • Voevodkin Vadim Leonidovich
  • Gebel' Anatolij Jakovlevich
  • Krasnov Vitalij Alekseevich
  • Lejfrid Aleksandr Viktorovich
  • Mazein Igor' Ivanovich
  • Opalev Vladimir Andreevich
  • Tret'Jakov Oleg Vladimirovich
  • Shalinov Andrej Vadimovich
  • Shirjaev Valerij Petrovich
RU2413875C2
METHOD OF SIMULTANEOUS SEPARATE OPERATION OF TWO WELL BEDS WITH DIFFERENTIAL PUMP WITH DRIVE ON TOP 2008
  • Parijchuk Nikolaj Ivanovich
RU2368806C1

RU 2 566 844 C1

Authors

Arslanov Dinar Damirovich

Galimov Radik Rastjamovich

Vanjurikhin Igor' Stepanovich

Legaev Jurij Nikolaevich

Pishchaev Dmitrij Vadimovich

Dates

2015-10-27Published

2014-11-14Filed