INSTALLATION OF SUCKER-ROD PUMP WITH PARALLEL PIPE STRINGS FOR OPERATION OF WELLS WITH INCREASED SAND PRODUCTION Russian patent published in 2024 - IPC E21B43/16 

Abstract RU 2815669 C1

FIELD: oil industry.

SUBSTANCE: invention relates to the oil industry, in particular to the production of well products with increased sand production and mechanical impurities. Sucker-rod pump unit with parallel pipe strings for operation of wells with increased sand production consists of a sucker-rod pump (SRP) lowered on a tubing string and having the possibility of being actuated through the sucker rod string. Unit is equipped with a production tubing string with a check valve in the lower part located parallel to the tubing string. Tubing string is filled with a liquid with density less than that of the well product, is closed in the upper part and is interconnected with the production string through the parallel anchor assembly located directly above the SRP, which is equipped with a protective bushing.

EFFECT: preventing sand ingress from above into the gap of the plunger pair of the pump, into the inner cavity of the plunger and onto the delivery valve.

1 cl, 2 dwg

Similar patents RU2815669C1

Title Year Author Number
INSTALLATION TO PREVENT FORMATION OF SAND PLUGS 2023
  • Bragin Dmitrii Viktorovich
  • Zairov Bulat Foatovich
RU2807365C1
BOREHOLE PUMP UNIT FOR SIMULTANEOUS OPERATION OF TWO BEDS WITH GAS BYPASS FROM UNDER PARKER SPACE (VERSIONS) 2011
  • Aminev Marat Khusnullovich
  • Lukin Aleksandr Vladimirovich
RU2464413C1
DUAL TUBING INSTALLATION FOR SELECTIVE COMPLETION OF TWO RESERVOIRS BY ONE WELL 2022
  • Belov Aleksandr Evgenevich
RU2790622C1
DOWNHOLE SUCKER-ROD PUMP UNIT FOR OIL PRODUCTION IN CONDITIONS OF HIGH GAS FACTOR 2024
  • Belov Aleksandr Evgenevich
RU2817441C1
SUCKER ROD PUMPING UNIT FOR HIGH-YIELD WELLS UNDER CONDITIONS OF HIGH GAS FACTOR 2023
  • Belov Aleksandr Evgenevich
RU2812377C1
METHOD OF SIMULTANEOUS SEPARATE OPERATION OF MULTIPLE-ZONE WELL BY TWO SUBMERSIBLE PUMPS AND EQUIPMENT FOR ITS IMPLEMENTATION 2012
  • Aminev Marat Khusnullovich
  • Lukin Aleksandr Vladimirovich
  • Shamilov Faat Takhirovich
RU2515630C1
METHOD FOR OPERATING AND REPAIRING A WELL EQUIPPED WITH A DOWNHOLE ROD PUMPING UNIT IN CONDITIONS COMPLICATED BY A DECREASE IN THE PRODUCTIVITY OF THE BOTTOMHOLE FORMATION ZONE 2022
  • Kasimov Ulfat Tagirovich
  • Pishchaeva Alsu Almazovna
RU2787502C1
PUMPING UNIT FOR EXPLOITATION OF FORMATIONS COMPLICATED BY SAND PRODUCTION WITH RESERVOIR PRESSURE GROWING FROM BOTTOM TO TOP 2023
  • Nuriakhmetov Lenar Nafisovich
RU2799221C1
ROD PUMP FOR OIL PRODUCTION FROM WELLS WITH WASH-OVER OF MECHANICAL IMPURITIES 2023
  • Belov Aleksandr Evgenevich
RU2796712C1
PLANT FOR SIMULTANEOUS OIL PRODUCTION FROM TWO FORMATIONS 2016
  • Mommert Karl-Heinz
  • Subbotin Vitalij Alekseevich
RU2630835C1

RU 2 815 669 C1

Authors

Bragin Dmitrii Viktorovich

Zairov Bulat Foatovich

Basos Georgii Iurevich

Dates

2024-03-19Published

2023-09-07Filed