FIELD: electricity.
SUBSTANCE: method includes check-up of rail circuits, availability of track sections, determination of the moment of rail circuit shunting by a train, connection to the engaged rail circuit at this moment, receipt of automatic train control (ATL) signals by the train. The connected sources of code ALT signals are synchronised against the carrier frequency phase and commencement of generation of cyclic code signals, at shunting of the next rail circuit two sources of code signals are coupled simultaneously to the first two rail circuits in direction of traffic when the transmitted codes coincide, when the codes transmitted to rail circuits and respectively to the rail line do not coincide then only the first signal code in direction of traffic is remained and connection of the second source and next sources is delayed till the moment of other circuits shunting in direction of traffic.
EFFECT: improved operational reliability of train signalling in the automatic block signal system without block joints when a train passes sections of adjacent rail circuits.
2 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
TRAIN CONTROL SYSTEM AND TRAIN SEPARATION METHOD IMPLEMENTED IN IT | 2014 |
|
RU2572278C1 |
METHOD FOR MONITORING THE STATE OF A RAIL LINE AND A SYSTEM FOR INTERVAL CONTROL OF TRAIN MOVEMENT ON A HAUL | 2021 |
|
RU2766015C1 |
AUTOMATIC INTERLOCK DEVICE | 2019 |
|
RU2709293C1 |
AUTO-LOCKING SYSTEM WITH TONE TRACK CHAINS | 2023 |
|
RU2796473C1 |
DEVICE FOR TRANSMITTING CONTROL COMMANDS OF AUTOMATIC LOCOMOTIVE SIGNALLING TO RAIL CIRCUITS OF CENTRALIZED AUTOMATIC BLOCKING SYSTEM | 2024 |
|
RU2822695C1 |
AUTO-LOCKING DEVICE WITH TONE TRACK CIRCUITS AND CENTRALIZED EQUIPMENT PLACEMENT | 2021 |
|
RU2773985C1 |
METHOD OF TRAIN SEPARATION AT STATION-TO-STATION BLOCK WITH AUTOMATIC BLOCK SYSTEM AND DEVICE TO THIS END | 2012 |
|
RU2491198C1 |
SYSTEM FOR INTERVAL CONTROL OF MOVEMENT OF TRAINS AT RAILWAY HAUL | 2013 |
|
RU2534084C1 |
DEVICE FOR TRANSFERRING CONTROL COMMANDS OF AUTOMATIC LOCOMOTIVE SIGNALING TO RAIL CIRCUITS OF A CENTRALIZED AUTO-BLOCKING SYSTEM | 2022 |
|
RU2783559C1 |
SYSTEM OF TRAIN SEPARATION AT SPANS | 2012 |
|
RU2503564C1 |
Authors
Dates
2015-12-10—Published
2014-08-15—Filed