FIELD: construction.
SUBSTANCE: drillstrings are arranged with appropriately directed devices, then surface erection and submersion of the entire massif of the facility is carried out in tiers along drillstrings as along guides. The first tier of the facility comprises a technical floor and one or more above floors, and subsequent tiers consist of one or more floors. Submersion of the facility is carried out as soil is excavated in the technical floor together with barrier walls, crossbars, slabs, and extraction of soil, supply of materials and equipment is carried out via technological openings in facility slabs.
EFFECT: reduced labour intensiveness and material intensity, reduction of time for erection of an underground facility, provides for higher stability of a facility during submersion and higher accuracy of facility submersion.
3 cl, 8 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF COMBINED BUILDING OF UNDERGROUND AND ABOVE-GROUND PART OF FRAME STRUCTURE | 2017 |
|
RU2657565C1 |
SUBWAY STATION AND METHOD OF ITS CONSTRUCTION (DEVICE AND METHOD NAMED AFTER YURKEVICH PB) | 2012 |
|
RU2505646C2 |
METHOD TO ERECT MULTISTORY SUBSURFACE STRUCTURE | 2009 |
|
RU2414563C1 |
TALL BUILDING | 2007 |
|
RU2350717C1 |
METHOD TO ERECT RECESSED STRUCTURES AND UNDERGROUND STRUCTURES OF BUILDINGS | 2012 |
|
RU2491387C1 |
SUBWAY STATION ERECTION METHOD (YURKEVICH(S METHOD) | 2014 |
|
RU2565314C2 |
PROCESS OF ERECTION OF UNDERGROUND STRUCTURE | 2001 |
|
RU2198263C1 |
MULTI-STORIED BUILDING AND METHOD OF ERECTION ON SLOPES OR CLIFFS | 2008 |
|
RU2376428C1 |
METHOD FOR DEPTH COMPENSATION COMPACTION OF SOIL | 2009 |
|
RU2405890C1 |
METHOD FOR STRUCTURE CONSTRUCTION IN THE UNDER-RUNNER SPACE OF RIVERS AND CANALS IN URBAN DEVELOPMENT | 2021 |
|
RU2770187C1 |
Authors
Dates
2015-12-20—Published
2014-04-22—Filed