FIELD: construction.
SUBSTANCE: spatial foundation support of a reservoir on a frozen base includes a pile foundation with a grill, a cooling system from a row of tubular elements laid on the base, a ventilated basement, Peltier microrefrigerators and heat insulation. The pile foundation includes a system of screw pile clusters, arranged along the circumference of the reservoir, protected with an elastic ring, filled with a heat insulation material, and covered with a heat insulation web to form a closed process basement. The ventilated basement is formed by a support frame in the form of a ventilated gap, installed between the bottom of the reservoir and the process basement.
EFFECT: increased reliability of design due to the stability of a structure, improved operation of the pile foundation in the process of reservoir operation, reduced material intensity and labour intensiveness.
10 cl, 7 dwg
| Title | Year | Author | Number | 
|---|---|---|---|
| METHOD OF CONSTRUCTION AND INSTALLATION OF PILES IN PERMAFROST ZONES USING HEAT STABILIZATION COUPLINGS | 2023 | 
 | RU2818341C1 | 
| METHOD OF SUPPORTING MINE SHAFT COLLAR IN PERMAFROST ROCKS | 1996 | 
 | RU2122119C1 | 
| COLLAPSIBLE STRUCTURE FOR THE ARCTIC ZONE | 2016 | 
 | RU2664078C2 | 
| DEVICE FOR STABILIZING PERMAFROST SOIL OF PILED FOUNDATION WITH CASINGS | 2018 | 
 | RU2681161C1 | 
| RUNWAY ON FROZEN SOILS | 2017 | 
 | RU2675133C1 | 
| METHOD FOR RESTORING BUILDINGS WITH A VENTILATED UNDERGROUND AFTER THAWING OF THE FOUNDATION SOILS | 2021 | 
 | RU2771359C1 | 
| METHOD OF INCREASING BEARING CAPACITY OF PILES IN PERMAFROST ZONE | 2024 | 
 | RU2837497C1 | 
| 0 | 
 | SU516803A1 | |
| SINGLE-LEVEL COOLER WITH CHAMBERS ERECTED ON HEAVING GROUND BASE | 2001 | 
 | RU2206686C1 | 
| ABOVE GROUND PIPELINE SUPPORT | 2022 | 
 | RU2781733C1 | 
Authors
Dates
2016-01-10—Published
2014-12-31—Filed