FIELD: metallurgy.
SUBSTANCE: first hollow billet of initial sizes is subjected to rolling at the ring-rolling mill to get the billet of the first pass. ID of said billet is increased to OD of the billet of initial sizes. The second billet of the same initial sizes in fitted into the first-pass billet to be roller at said ring-rolling mill. The second-pass billet is thus made with its ID increased to OD of the billet of initial sizes. The, the cycle is reiterated. Straightening and/or annealing are performed between the passes.
EFFECT: fabrication of sandwiched hollow billets of high hardening.
2 cl, 3 dwg, 1 tbl, 1 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR PROCESSING RANDOM PIPE SECTIONS | 2022 |
|
RU2786705C1 |
METHOD OF DRAWING | 2009 |
|
RU2476288C2 |
METHOD OF COMPRESSION WITH INTENSIVE PLASTIC DEFORMATION | 2009 |
|
RU2443493C2 |
METHOD FOR PRODUCING PIPE FROM TECHNICALLY PURE TITANIUM WITH RADIAL TEXTURE | 2012 |
|
RU2504598C2 |
METHOD OF PRODUCTION OF COLD-WROUGHT SEAMLESS PIPES AND HEAT-RESISTANT SEAMLESS PIPE MADE BY THIS METHOD | 2013 |
|
RU2563566C2 |
METHOD OF PRODUCTION OF COLD-WROUGHT SEAMLESS PIPES (VERSIONS) AND HEAT-RESISTANT SEAMLESS PIPE MADE BY THIS METHOD (VERSIONS) | 2014 |
|
RU2557839C1 |
PRODUCTION PF LONG-LENGTH SANDWICHED BIMETALLIC LARGE-DIAMETER PIPES THAT FEATURE LONGER LIFE IN AGGRESSIVE MEDIA FOR TRANSFER OF HYDROCARBONS WITH HIGHER CONTENT OF SULFUR | 2012 |
|
RU2523407C1 |
PRODUCTION METHOD OF TUBE STOCK OF LARGE AND MEDIUM DIAMETERS FROM TITANIUM-BASED ALLOYS | 2012 |
|
RU2511190C1 |
TITANIUM ALLOY PIPE | 2023 |
|
RU2825502C1 |
MANUFACTURING METHOD OF HEXAGONAL PIPE WORKPIECES WITH FLAT-TO-FLAT DIMENSION OF 181,8±0,4×3,5+0,3/-0,2×3750+20/-0 mm FROM STEEL GRADE "12Х12М1БФРУ-Ш" FOR FAST NEUTRON NPP REACTORS | 2013 |
|
RU2545949C2 |
Authors
Dates
2016-01-20—Published
2014-06-11—Filed