FIELD: machine building.
SUBSTANCE: method involves the stages at which: multiple elements of latency period are stored in memory block, pulse signal is generated in signal output block during process cycle, element of latency period from the said memory block is calculated, zero signal is created in said signal output block for multiple processor cycles, received from said read element of latency period, signals generated in said signal of output block for each cycle are delivered to digital-to-analogue converter, and stages of the pulse signal generation, reading of element of latency period, and creation of zero signal for each pulse signal in series of pulse signals.
EFFECT: assurance of possibility to calibrate measuring system of crowns synchronisation in turbine machine.
5 cl, 5 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD AND MONITORING SYSTEM FOR CONTROLLING CONDITION AND EMERGENCY PROTECTION OF BLADE DEVICES OF ROTOR ENGINES | 2002 |
|
RU2241216C2 |
DEVICE FOR ANALYSIS OF DYNAMIC PROCESSES IN IMPELLERS OF TURBINE MACHINES | 2017 |
|
RU2659428C1 |
METHOD OF PROCESSING PERFORATED HOLES IN HOLLOW BLADES OF TURBOMACHINE AND INSTALLATION FOR ITS IMPLEMENTATION | 2019 |
|
RU2710087C1 |
METHOD OF DIAGNOSING RESONANCE VIBRATIONS IN AXIAL TURBOMACHINE IMPELLER VANES | 2011 |
|
RU2451279C1 |
METHOD AND DEVICE FOR MEASURING EROSION WEAR OF TURBINE ROTOR BLADE EDGES | 1993 |
|
RU2089878C1 |
SYSTEM FOR CONTACT-FREE DETERMINING OF TURBOMACHINE BLADE OSCILLATION AMPLITUDE | 0 |
|
SU661285A2 |
DEVICE FOR CHECKING CONDITION OF TURBO-MACHINE VANES | 0 |
|
SU1453206A1 |
METHOD OF DIAGNOSTICS OF SHAFTS FOR ROTOR MACHINES TRANSMITTING TORQUE LOADING | 2002 |
|
RU2239803C2 |
METHOD OF MEASURING AMPLITUDE OF OSCILLATION OF BLADES OF TURBO-MACHINES AND DEVICE TO THIS END | 2007 |
|
RU2341781C2 |
MONITORING SYSTEM TO PRESENT OSCILLATORY STATES OF BLADES ON ROTATING IMPELLER | 1994 |
|
RU2125247C1 |
Authors
Dates
2016-02-10—Published
2012-07-17—Filed