FIELD: construction.
SUBSTANCE: invention relates to method of concrete slab span rail bridge reconstruction by increasing the longitudinal sides of the ballast trough plate by concreting. The method envolves the use of anchors to form the reinforcing framework of longitudinal side extension piece, which consists of the transverse reinforcement attached to the anchors, and joint at the top by the longitudinal reinforcement.
EFFECT: invention allows to increase the carrying capacity of the longitudinal side and provide railway track lateral stability.
2cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR CYCLIC MOVEMENT OF SOLID REINFORCED CONCRETE BRIDGE SPAN IN LONGITUDINAL DIRECTION | 2004 |
|
RU2242559C1 |
RING HIGHWAY OF MEGAPOLICE AND METHOD FOR ITS RECONSTRUCTION | 1998 |
|
RU2136803C1 |
RECONSTRUCTED FERROCONCRETE BALLAST SPANSTRUCTURE OF RAILWAY BRIDGE | 0 |
|
SU1546535A1 |
BRIDGE CONSTRUCTION, ENCLOSING EMBANKMENT OF RAIL WAY BED OF THE BRIDGE CONSTRUCTION, JOINING THE BRIDGE CONSTRUCTION TO ACCESS EMBANKMENT AND REINFORCED SKELETON OF BRIDGE CONSTRUCTION BEAM | 1992 |
|
RU2043458C1 |
CONSTRUCTION METHOD FOR BRIDGE OR OVERPASS | 2002 |
|
RU2251604C2 |
PROCESS WIDENING BRIDGE STRUCTURE | 2001 |
|
RU2205914C1 |
METHOD FOR FLOOR OR SPAN STRUCTURE ERECTION | 2005 |
|
RU2303681C1 |
METHOD FOR RECONSTRUCTION OF OVERPASS WITH DISPLACEMENT OF RECONSTRUCTED RAILWAY BRIDGE AFLOAT | 1999 |
|
RU2152477C1 |
METHOD OF BRIDGE BUILDING OVER WATER BODY | 2004 |
|
RU2237123C1 |
METHOD OF RECONSTRUCTION OF BRIDGEWORK WITH DISPLACEMENT OF RAILWAY BRIDGE FRAMEWORK AFLOAT AND ERECTION OF PEDESTRIAN BRIDGE | 2000 |
|
RU2198978C2 |
Authors
Dates
2017-03-15—Published
2015-09-07—Filed