FIELD: oil industry.
SUBSTANCE: invention relates to oil industry, namely to method of water shutoff works in well. Method includes stages, at which insulating compound is prepared in volume exceeding internal volume of well from bottomhole to upper border of perforation interval. Then filling pipe string is lowered into well, insulating compound is poured into well at least to upper border of perforation interval with flushing into formation. Wherein at different levels along perforation interval insulating compound with different values of mobility is poured. Filling pipe string is removed from well. Insulating compound is left to harden. After hardening of insulating compound insulating compound is drilled and formation is opened by sparing well perforation in roof part of formation.
EFFECT: technical result is high efficiency and reliability of water shutoff in well.
14 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR CARRYING OUT WATER SHUTOFF TREATMENT IN WELL | 2016 |
|
RU2622965C1 |
METHOD AND SYSTEM FOR WATERPROOFING WORKS IN WELL | 2014 |
|
RU2586120C2 |
PROCEDURE FOR WATER SHUTOFF TREATMENT IN WELL | 2016 |
|
RU2618538C1 |
PLANT FOR WATER INSULATION WORKS IN WELL | 2014 |
|
RU2605974C2 |
METHOD FOR WATER ISOLATION IN THE BOTTOM-HOLE ZONE OF THE PRODUCTION WELL | 2021 |
|
RU2772069C1 |
WATER AND GAS INFLUX LIMITING METHOD WITH WELL PRODUCTIVITY RECOVERY | 2013 |
|
RU2539047C1 |
METHOD OF DEVELOPMENT OF FLOODED OIL DEPOSIT | 2012 |
|
RU2504650C1 |
METHOD FOR PREVENTION OF BOTTOM WATER INFLUX TO PRODUCING OIL WELL | 2016 |
|
RU2620684C1 |
METHOD OF CONDUCTING WATER-INSULATING WORKS IN THE EXTRACTING WELL, EXCLUDING THE WATER OIL DEPOSIT | 2017 |
|
RU2661935C1 |
METHOD OF HYDRAULIC FRACTURING OF WELL FORMATION | 2011 |
|
RU2483209C1 |
Authors
Dates
2017-03-16—Published
2016-04-14—Filed