FIELD: construction.
SUBSTANCE: method of grouting involves sequential injection masses of gas and of mounting solution into the compactor. The fortifying solution is made in advance. It consists of an aqueous emulsion of a mixture of epoxy resins and a hardener; after that compressed air at a pressure of 0.1-0.3 MPa is pumped into the soil mass to extrude the groundwater from the pores. The fortifying solution is then injected into the pore spaces under pressure of 0.1-0.2 MPa and molding is produced by re-injection of compressed air, followed by re-injection of the next portion of the fortifying solution.
EFFECT: improved efficiency of grouting in sandy, macroporous and silty clay soils, including grouting at low temperature.
6 cl, 3 dwg
| Title | Year | Author | Number | 
|---|---|---|---|
| METHOD FOR CONSTRUCTION OF CAST-IN-PLACE PILE | 1994 | 
 | RU2087617C1 | 
| CONSTRUCTION METHOD OF BUILT-IN STRUCTURAL ELEMENTS IN SOIL | 2002 |  | RU2221918C2 | 
| METHOD FOR DAMP-PROOFING OF BELOW-GRADE BUILDING | 2006 | 
 | RU2333321C1 | 
| METHOD FOR ERECTION OF INJECTION DOWEL PIN AND INJECTION DOWEL PIN ERECTED BY THIS METHOD | 2009 | 
 | RU2405888C1 | 
| METHOD TO MANUFACTURE NON-METAL REINFORCEMENT ELEMENT WITH PERIODIC SURFACE AND REINFORCEMENT ELEMENT WITH PERIODIC SURFACE | 2011 | 
 | RU2482247C2 | 
| METHOD OF ERECTION OF SLAB REINFORCED CONCRETE FOUNDATION | 2018 | 
 | RU2692396C1 | 
| REINFORCEMENT ELEMENT FOR PRESTRESSED CONCRETE STRUCTURES | 2010 | 
 | RU2455436C1 | 
| METHOD FOR REINFORCING BASEMENT SOIL | 2006 | 
 | RU2333318C1 | 
| CAST-IN-PLACE SUPPORTING STRUCTURE ERECTION METHOD AND CAST-IN- PLACE SUPPORTING STRUCTURE | 2003 | 
 | RU2252298C1 | 
| METHOD OF CONSTRUCTING GROUND ANCHOR AND GROUND ANCHOR ITSELF | 1997 | 
 | RU2131495C1 | 