FIELD: machine building.
SUBSTANCE: invention relates to the field of railway automatic systems and telemechanics. The system contains the installed on the locomotive and the tail car kits, which include on-board equipment unit, a microcontroller with an integrated transceiver module, an onboard receiver coil and a receiver board. The station has traveling loops, each of them has a track generator, a microcontroller with an integrated transceiver module and wired interface. Wherein, all wired interfaces are associated with the central unit train traffic control station equipment via a wired link.
EFFECT: invention provides a simplification of equipment integrity control structure, improving its reliability and control of the reliability.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
SYSTEM FOR DETERMINING UNOCCUPANCY OF TRACK SECTIONS BY ROLLING STOCK | 2015 |
|
RU2600175C1 |
TRAIN CONTROL SYSTEM ON RAILWAY HAUL | 2015 |
|
RU2591551C1 |
SYSTEM FOR CONTROL OF RAILWAY STATION LIMIT NON-OCCUPANCY | 2010 |
|
RU2438905C1 |
TRAIN TRAFFIC CONTROL SYSTEM | 2022 |
|
RU2783558C1 |
METHOD FOR DETERMINING THE FREEDOM FROM ROLLING STOCK OF TRACK SECTIONS ON A RAILWAY STRETCH | 2021 |
|
RU2762453C1 |
TRAIN FULL-LENGTH PASSING CONTROL DEVICE | 2019 |
|
RU2702370C1 |
TRAIN TRAFFIC CONTROL SYSTEM ON RAILWAY PASSING THROUGH TUNNELS | 2015 |
|
RU2591552C1 |
SYSTEM TO DETERMINE RAILWAY HAUL UNOCCUPANCY | 2010 |
|
RU2452644C2 |
SYSTEM FOR INTERVAL CONTROL OF MOVEMENT OF TRAINS BASED ON RADIO CHANNEL | 2018 |
|
RU2685109C1 |
SYSTEM FOR INTERVAL REGULATION OF TRAIN TRAFFIC | 2020 |
|
RU2746629C1 |
Authors
Dates
2017-03-23—Published
2015-11-18—Filed