FIELD: construction.
SUBSTANCE: foundation comprises a plurality N of bored piles, where N≥3, with the anchor bolts M, where M≥1, N profiles with the first and the second end portion of each, and fixing elements. It additionally comprises the housing, N connection elements, N support plates with an opening, and N compensating elastic inserts with an opening. The profiles are arranged so that the axis of the profiles in the plan form a bundle of direct lines, the first end portions of the profiles are mechanically connected to the housing to form a single radially-beam construction. The bored piles are located on the direct lines of the said beam. The support plates are arranged on the bored piles. The compensating elastic inserts are arranged on the support plates. The connection elements are located on the profiles, one connecting element at each profile. Anchor bolts pass successively through the openings in the support plates and the openings in the compensating elastic inserts. Each second end portion of the profile is mechanically coupled to a corresponding anchor bolt.
EFFECT: reducing the concrete consumption of the foundation, design simplification, shortening the time for the foundationconstruction in remote and inaccessible areas, preventing the forces of frost heaving, preventing the settlement and the lateral displacement.
10 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR EXCITING SLOT ANTENNA WITH MULTI-LOOP CONDUCTOR AND DEVICE FOR ITS IMPLEMENTATION | 2021 |
|
RU2812810C2 |
DUAL-FREQUENCY GLIDE-PATH RADIO BEACON | 2016 |
|
RU2624263C1 |
METHOD FOR TRANSFER OF LONG-SPAN STEAM-AND-WATER MIXTURE DELIVERY PIPELINE OVER CANYON LOCATED IN SEISMICALLY ACTIVE ZONE | 2023 |
|
RU2815705C1 |
GLIDE-PATH TRANSMITTER | 2018 |
|
RU2693024C1 |
METHOD FOR ADJUSTING INFORMATION PARAMETER OF COURSE-GLIDE PATH BEACONS AND ITS IMPLEMENTATION DEVICE (EMBODIMENTS) | 2017 |
|
RU2695316C2 |
TELESCOPIC SCREW PILE WITH LEADER PILE | 2021 |
|
RU2763573C1 |
FRAGILE MAST | 2014 |
|
RU2552552C1 |
GLIDE PATH BEACON | 2023 |
|
RU2818668C1 |
METHOD FOR ERECTION OF BORED PILE WITH SOIL-CEMENT BROADENINGS IN WEAK SOILS ZONE AND DEVICE FOR ITS IMPLEMENTATION (VERSIONS) | 2019 |
|
RU2725363C1 |
METHOD FOR PRODUCTION OF BORE PILE | 2015 |
|
RU2596170C1 |
Authors
Dates
2017-05-04—Published
2015-08-14—Filed