FIELD: construction.
SUBSTANCE: for tamping the railway track by means of a measuring device, the path position errors are eliminated and the correction amounts of new gravel to be supplied are calculated, and the gravel amount to be used in case of necessity is accumulated. The accumulated gravel amount is dumped, as soon as the gravel filling device reaches the respective track section following the measuring device in the working movement direction.
EFFECT: possibility of the uniform correction of the railway track position.
6 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
ROADWAY MACHINE AND A METHOD FOR STABILIZING A RUBBLEWORK | 2020 |
|
RU2774321C1 |
METHOD OF TIE TAMPING AND TIE TAMPING OUTFIT | 2001 |
|
RU2225908C2 |
RAIL TRACK REPAIR MACHINE | 2001 |
|
RU2228983C2 |
TAMPING MACHINE FOR COMPACTING THE BALLAST BED OF A TRACK | 2015 |
|
RU2684882C2 |
MOBILE GRAVEL-CLEANING MACHINE | 0 |
|
SU1505446A3 |
METHOD OF INSPECTION OF PROFILE OF CRUSHED STONE BALLAST BASE | 2003 |
|
RU2250283C1 |
SLEEPER-TAMPING MACHINE | 0 |
|
SU1558304A3 |
BALLAST SPREADING MACHINE AND METHOD OF TRACK BALLASTING | 1998 |
|
RU2150545C1 |
TIE-TAMPING MACHINE AND METHOD OF TIE TAMPING | 2003 |
|
RU2249644C1 |
TAMPING ASSEMBLY FOR A TRACK TAMPING MACHINE | 2015 |
|
RU2684349C2 |
Authors
Dates
2017-05-12—Published
2013-05-06—Filed