FIELD: oil and gas industry.
SUBSTANCE: arrangement of the drill string bottom contains the first sensor adapter, located near the drill bit and performed with the ability to control one or more operating parameters, related to the drilling bit, the second sensor adapter, separated from the first sensor adapter along the axis, and located near the reamer and executed with the ability to control one or more of the operating parameters of the reamer, and the communication module, connected to the first and the second sensor adapter through the communication means and made with the ability to transmit along them one or more signals of corrective actions in case, if one or more of the drill bit and the reamer operating parameters exceeds the specified operating level, and one of the hydraulic adapter and the downhole propulsion plant, installed between the drill bit and the reamer and connected to the communication module to receive one or more corrective actions signals and activation, in response to this, the load distribution balancing between the bit load and the load to the reamer.
EFFECT: load balancing and hydraulic power distribution between the individual downhole cutting tools.
17 cl, 5 dwg
Title | Year | Author | Number |
---|---|---|---|
SYSTEM (VERSIONS) AND METHOD (VERSIONS) FOR WELL CUTTING TOOLS HYDRAULIC BALANCING | 2012 |
|
RU2618549C2 |
SYSTEM AND METHOD FOR SIMULATION OF INTERACTION OF REAMER AND BIT | 2010 |
|
RU2564423C2 |
CLOSED CYCLE OF DRILLING PARAMETERS CONTROL | 2013 |
|
RU2639219C2 |
STRATEGIC FLEXIBLE SECTION FOR ROTARY CONTROLLED SYSTEM | 2018 |
|
RU2732162C1 |
CONTROL OF WELLBORE DRILLING COMPLEXES | 2013 |
|
RU2640607C1 |
WIDE-RANGE MOTOR FOR WIDE APPLICATION | 2015 |
|
RU2706997C2 |
CASING PIPE LOWERING TOOL, ANCHORING SYSTEMS AND METHODS | 2017 |
|
RU2745315C2 |
FLEXIBLE WEIGHTED DRILL PIPE FOR ROTARY CONTROLLED SYSTEM | 2017 |
|
RU2707208C1 |
SYSTEM AND METHOD FOR AUTOMATIC CALIBRATION OF LOAD AT DRILL BIT TRANSDUCER AND CONTROL OVER DRILL STRING FLEXURE | 2012 |
|
RU2567575C1 |
CHARACTERIZING RESPONSES IN DRILLING SYSTEM | 2016 |
|
RU2721203C2 |
Authors
Dates
2017-07-04—Published
2012-12-28—Filed