FIELD: mining engineering.
SUBSTANCE: method for covering surface of tailings impoundments is to consistently cover the contaminated area with layers. As layers, inert materials are used in the following sequence: potentially fertile overburden rocks, sand and gravel mixtures, vermiculite, ash-and-slag wastes.
EFFECT: increasing the reliability of tailings impoundments surface covering, ensuring environmental safety of tailings wastes, reducing costs.
1 cl
Title | Year | Author | Number |
---|---|---|---|
METHOD OF CREATION OF VEGETATIVE GROUND COVER IN RECULTIVATION OF DISTURBED SOILS | 2011 |
|
RU2484613C2 |
METHOD OF TAILING DUMPS RECLAMATION | 2017 |
|
RU2643038C1 |
DISTURBED GROUND REGENERATION METHOD | 1992 |
|
RU2030851C1 |
METHOD FOR LAND RECLAMATION IN THE CASE OF LAND CORRUPTION BY OPENED DEPOSIT DEVELOPMENT | 2005 |
|
RU2274750C1 |
RECLAMATION METHOD OF DISTURBED LANDS | 2018 |
|
RU2715768C2 |
METHOD FOR BIOLOGICAL RECLAMATION OF MAN-MADE WATER BODIES IN ARCTIC AND SUBARCTIC CONDITIONS | 2021 |
|
RU2774752C1 |
METHOD FOR RECULTIVATION OF TAILING DUMPS | 2012 |
|
RU2513468C1 |
METHOD FOR RECLAMATION OF CONTAMINATED LANDS AND WASTE DUMPS | 2020 |
|
RU2746246C1 |
METHOD OF LAND RECLAMATION, DISTURBED BY DREDGING WORKS | 2013 |
|
RU2527368C1 |
METHOD FOR PREPARING THE SURFACE OF AUTOMOBILE DISPLAYS FOR FOREST DIRECTION OF RECLAMATION UNDER DRID CONDITIONS OF COAL MINING | 2021 |
|
RU2779159C1 |
Authors
Dates
2017-08-21—Published
2016-12-20—Filed