FIELD: heating system.
SUBSTANCE: subscriber input of the building heat supply system contains the supply and return pipelines with valves, manometers, mud pumps, thermometers, heat meters, branches for heating, ventilation and for the analysis of hot water from the heating network. At the same time, in the branch for heating needs, parallel pipelines are installed with cavitation flow restrictors placed on them and normal-open check valves located before them. On one of the parallel pipelines, before the cavitation flow limiter there is no check valve. Parallel pipelines with valves are controlled from the controller with a timer that signals the valves to close or open them in a certain period.
EFFECT: increasing the efficiency of the work of subscriber inputs of heat supply systems of buildings due to the adjustment of the amount of supplied heat energy to the building systems according to performance indicators during periods of sharply variable thermal loads.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
HEAT AND COLD SUPPLY SYSTEM | 2015 |
|
RU2609266C2 |
METHOD OF CONNECTING LOW-POTENTIAL HEAT SOURCE TO HOT WATER SUPPLY SYSTEM | 2024 |
|
RU2826917C1 |
DESIGN OF INDIVIDUAL HEAT POINT WITH INDEPENDENT CONNECTION OF LOCAL HEATING SYSTEM | 2020 |
|
RU2741188C1 |
DESIGN OF INDIVIDUAL HEAT POINT | 2018 |
|
RU2689873C1 |
METHOD OF AUTOMATIC CONTROL OF COMBINED HEAT LOAD | 2006 |
|
RU2320928C2 |
METHOD OF HEAT ENERGY SUPPLY TO CONSUMERS IN CENTRALISED SYSTEMS | 2006 |
|
RU2334173C1 |
HOT WATER SUPPLY METHOD | 2013 |
|
RU2561846C2 |
HEAT SUPPLY SYSTEM | 0 |
|
SU1815517A1 |
HOT WATER SUPPLY SYSTEM | 2020 |
|
RU2793831C2 |
HEAT CENTER | 1998 |
|
RU2151345C1 |
Authors
Dates
2017-08-24—Published
2016-05-30—Filed