FIELD: machine engineering.
SUBSTANCE: installation for identifying the turbulent initial section in the small cross-section channels contains a container for the Newtonian fluid under investigation and a heat exchanger, which is a pipeline consisting of several parallel sections connected together. The cavity of the said container is connected to the inlet part of the heat exchanger cavity. The outlet part of the heat exchanger cavity opens into the cavity of the measuring container mounted on the high-precision scales. The cavity of the container for the investigated liquid is additionally connected to the outlet cavity of the compressor unit, and the inlet part of the measuring container cavity is connected to the outlet branch of the container for the investigated liquid through the cavity of the heat exchanger and through the container cavity of the investigated liquid - with the cavity of the compressor unit.
EFFECT: eliminating the liquid pulsations for measurements.
3 dwg
Title | Year | Author | Number |
---|---|---|---|
HYDRAULIC VIBRATION SUPPORT | 1997 |
|
RU2135855C1 |
METHOD OF SPACECRAFT PROPULSION INSTALLATION FUELLING BY XENON AND DEVICE FOR ITS IMPLEMENTATION | 2006 |
|
RU2341424C2 |
UNIT FOR HYDROCARBON ROCKET FUEL RESEARCH | 2018 |
|
RU2664443C1 |
PROCESS AND GEAR FOR DEVELOPMENT AND CLEARING OF FACE ZONE OF WELLS BY PULSE DRAINAGE | 1999 |
|
RU2159326C1 |
METHOD FOR HEAT EXCHANGE OF LAMINAR FLOWS OF HIGH-VISCOSITY OIL IN CHANNELS WITH THREE-THREAD SCREW INSERT AND DEVICE FOR IMPLEMENTATION THEREOF | 2019 |
|
RU2726024C1 |
APPARATUS FOR COOLING NATURAL GAS AT COMPRESSOR STATIONS | 2019 |
|
RU2709998C1 |
DEVICE FOR INVESTIGATING THE PROCESS OF CAPILLARY DISPLACEMENT OF OIL FROM POROUS MEDIUM | 0 |
|
SU1624140A1 |
METHOD FOR HYDRAULIC FRACTURING OF BED | 2003 |
|
RU2244815C1 |
SYSTEM FOR WITHDRAWAL OF GAS FROM CUT-OFF SECTION OF GAS LINE INTO OPERATING GAS LINE AND PROCEDURE FOR WITHDRAWAL OF GAS FROM CUT-OFF SECTION OF GAS LINE INTO OPERATING GAS LINE | 2009 |
|
RU2400646C1 |
RECOVERING METHOD OF WORKING CONDITION OF GAS-OIL PRODUCTION WELL WITH HORIZONTAL AND/OR SUBHORIZONTAL END DURING OPERATION, AND TECHNOLOGICAL COMPLEX FOR METHOD'S IMPLEMENTATION | 2011 |
|
RU2482268C1 |
Authors
Dates
2017-09-05—Published
2016-07-25—Filed