FIELD: mining engineering.
SUBSTANCE: excavation surface is scanned to develop the profile of the excavation surface. The excavation plan is chosen for the profile of the excavation surface. The excavation plan is fulfilled for the profile of the excavation surface on the excavation surface using a cargo pre-weighing algorithm based on a variety of drive signals of excavating equipment. And the volume of material to be excavated by means of quarry excavating equipment is determined basing on at least a plurality of drive signals, a plurality of derivatives of the drive signals and an excavation surface profile.
EFFECT: increased accuracy of determination.
20 cl, 9 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR CONTROL OF LORRIES IN OPEN PITS DURING SELECTIVE ORE EXTRACTION AND SYSTEM FOR AUTOMATIC CONTROL OF ORE DELIVERY BY MEANS OF EXCAVATOR-LORRY COMPLEX | 1996 |
|
RU2100844C1 |
SYSTEM AND METHOD FOR MANAGING THRESHOLD QUANTITIES OF RETURNABLE MATERIAL ON SURFACE DURING DELIVERY | 2020 |
|
RU2809488C2 |
METHOD FOR ZONING OF EXCAVATING BOTTOMS TO CONTROL OPERATION OF EXCAVATOR-CAR COMPLEXES | 2020 |
|
RU2738919C1 |
SYSTEM AND METHOD FOR MANAGING RETURNABLE MATERIAL ON SURFACE DURING DELIVERY | 2020 |
|
RU2805764C2 |
SYSTEM AND METHOD FOR DETERMINING RETURNABLE MATERIAL ON SURFACE DURING DELIVERY | 2020 |
|
RU2819339C2 |
SYSTEM AND METHOD FOR AUTOMATED CLEANING OF RETURNED MATERIAL ON SURFACE DURING DELIVERY | 2020 |
|
RU2801144C2 |
POWER SHOVEL | 1991 |
|
RU2005855C1 |
BUCKET AND EARTHMOVING DEVICE CONTAINING SUCH A BUCKET | 2018 |
|
RU2784800C1 |
DEVICE FOR SOIL MATERIAL EXCAVATION UNDER WATER | 2010 |
|
RU2553814C2 |
METHOD OF OPENCAST MINING OF MINERAL DEPOSITS AND EXCAVATOR-HOPPER TRANSFER POINT FOR METHOD EMBODIMENT | 2001 |
|
RU2204720C2 |
Authors
Dates
2017-10-12—Published
2013-09-19—Filed