FIELD: oil and gas industry.
SUBSTANCE: method is carried out in formations with a low permeability. The initial permeability of the formation is less than 10 mD. A pair of electrodes is set. Various voltages are supplied between pairs of electrodes of specified frequency. In this case, the potential difference is more than at least 10000 V. The potential difference between the pairs of electrodes is provided by pulses of less than 500 ns duration with the formation of plasma discharges. Rock mass is removed between electrodes to reduce stress in formation by at least 5% of initial voltage in formation. Due to electric arc, rock is removed in local area with formation of channels.
EFFECT: increased permeability of formations.
18 cl, 5 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR DEVELOPMENT OF DENSE OIL DEPOSIT BY ELECTRIC FRACTURE | 2020 |
|
RU2733239C1 |
METHOD FOR DEVELOPMENT OF MULTI-FACE LOW-PERMEABLE OIL DEPOSIT BY ELECTRIC FRACTURE | 2020 |
|
RU2733240C1 |
ADVANCED ELECTRICAL HYDROLYSIS OF THE PLASTER | 2013 |
|
RU2630000C2 |
METHOD FOR TREATING A SUBTERRANEAN FORMATION WITH A MORTAR SLURRY WITH THE POSSIBILITY OF FORMATION OF A PERMEABLE LAYER OF HARDENED MORTAR SLURRY | 2013 |
|
RU2656266C2 |
METHOD FOR HYDRAULIC FRACTURING OF OIL, GAS OR GAS CONDENSATE FORMATION | 2019 |
|
RU2723806C1 |
METHOD OF OPERATION OF PRODUCTION AND WATER-BEARING FORMATIONS SEPARATED BY IMPERMEABLE INTERLAYER, WELL WITH HORIZONTAL SHAFTS AND CRACKS OF FORMATION HYDRAULIC FRACTURING | 2016 |
|
RU2630514C1 |
DIFFICULT TURONIAN GAS PRODUCTION METHOD | 2020 |
|
RU2743478C1 |
HYDRAULIC FRACTURING METHOD USING FLUID MEDIUM WITH LOW VISCOCITY AND WITH LOW SPEED OF PROPPANT SETTLEMENT | 2018 |
|
RU2747957C1 |
METHOD FOR IMPLEMENTING HYDRAULIC FRACTURING AND BRINGING A WELL TO PRODUCTION | 2022 |
|
RU2798193C1 |
REINFORCED PROPPANT CLUSTERS FOR FORMATION HYDRAULIC FRACTURING | 2015 |
|
RU2687722C2 |
Authors
Dates
2018-01-09—Published
2013-03-27—Filed