FIELD: measuring equipment.
SUBSTANCE: system includes control center and at least one other point of measurement, with the path component contains at least one first measuring device for measuring the first measuring values to describe working condition path component and at least one transmitter for transmitting the first measuring values from the component path in the control center. In this case, the measurement site contains another, second measuring device for measuring the path components independent of the operating state, the second measuring values. With at least another, second measuring device is located at a distance from the road, and when the control center contains at least one receiver for first transmission of measuring values from the first measuring device path component in the control center and at least one controller for the first evaluation of the measuring values using specified algorithm in direct dependence on the second the measuring values.
EFFECT: increasing the accuracy of path diagnostics.
9 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
DIAGNOSTIC TECHNIQUE FOR RAILWAY VEHICLES | 2013 |
|
RU2608992C2 |
COMBINATION OF RAILWAY VEHICLES | 2014 |
|
RU2644841C2 |
SYSTEM FOR DIAGNOSTICS AND CONTROL OF AIR SUPPLY UNITS AND THEIR COMPONENTS | 2019 |
|
RU2767309C1 |
RAILWAY VEHICLE WHEELS CONDITION DIAGNOSTICS | 2015 |
|
RU2696412C2 |
METHOD OF STATE CONTROL OF A LONG OBJECT AND DEVICE FOR ITS IMPLEMENTATION FOR RAILWAY | 2017 |
|
RU2676176C1 |
SYSTEM FOR MONITORING READINESS OF FRONT TO CARRY OUT THE MACHINE ALIGNMENT OF THE RAILWAY TRACK | 2022 |
|
RU2793867C1 |
METHOD OF FORMING RESULTS OF MEASUREMENTS BASED ON SIGNALS OF SENSORS | 2014 |
|
RU2643746C2 |
RAILWAY MONITORING SYSTEM FOR DETECTING PARTIAL OR COMPLETE FAILURE OF RAILWAY ROADS | 2017 |
|
RU2743390C2 |
RAIL VEHICLE | 2015 |
|
RU2669880C2 |
DIAGNOSTIC AND MONITORING METHOD AND DEVICE FOR RAILWAY POINTS, CROSSINGS, TURN-OUTS OR RAIL JOINTS | 2005 |
|
RU2349480C2 |
Authors
Dates
2018-02-07—Published
2013-08-23—Filed