FIELD: machine building.
SUBSTANCE: method of the thermal power plant gas turbine-expander power unit operation is that the atmospheric air is compressed in compressor, supplied into combustion chamber, fuel is burned, combustion products are expanded in gas turbine, gas turbine useful work is used to generate electricity, turboexpander useful work is used to drive compressor. In the gas turbine-expander power unit, regenerative air heater, booster gas compressor, and the gas turbine exhaust gases heat utilization heat exchanger are additionally applied, at that, the high-pressure gas pre-heating and the exhaust gases heat utilization heat exchangers are made gas-water ones. by of hot and cooled down coolant pipelines utilizing the heat of the exhaust gases gas-water heat exchanger is connected to the high-pressure gas pre-heating gas-water heat exchanger and to the reduced pressure gas pre-heating gas-water heat exchanger. Small part of the gas from the high-pressure gas pipeline of 1.0–0.6 MPa is compressed in booster gas compressor and with a pressure of 2.5–3 MPa supplied to the combustion chamber. Most part of the high-pressure gas is pre-heated by the hot coolant heat in the high-pressure gas pre-heating gas-water heat exchanger, expanded in turboexpander to the pressure of 0.13–0.15 MPa and temperature of 3–5 °C. Then this gas is pre-heated by the hot coolant heat in the low-pressure gas-water heat exchanger and supplied to the thermal power plant boiler units through the reduced pressure gas pipeline. Cooled down in the high and low pressure gas pre-heating gas-water heat exchangers coolant is sent to the gas turbine exhaust gases heat utilization gas-water heat exchanger for pre-heating. With the gas pressure change in the high-pressure gas pipeline, using the low-pressure gas pressure control system to change the turboexpander regulating guide vanes position and maintaining constant gas pressure in the low-pressure gas pipeline supplied to the thermal power plant boiler units.
EFFECT: proposed is the gas turboexpander power unit operation method.
1 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF OPERATION OF REGENERATIVE GAS TURBINE EXPANDER POWER UNIT OF COMBINED HEAT AND POWER PLANT AND DEVICE FOR ITS IMPLEMENTATION | 2022 |
|
RU2807373C1 |
METHOD FOR OPERATION OF THE POWER GAS TURBINE EXPANDER INSTALLATION OF THE HEAT POWER PLANT | 2022 |
|
RU2791066C1 |
GAS TURBINE EXPANDER POWER PLANT OF THERMAL POWER PLANT | 2018 |
|
RU2699445C1 |
COMPRESSOR STATION OF MAIN GAS LINE WITH GAS TURBINE EXPANDER POWER PLANT | 2014 |
|
RU2576556C2 |
REGENERATIVE GAS TURBINE EXPANDER UNIT FOR COMPRESSOR STATION | 2014 |
|
RU2570296C1 |
METHOD FOR PREPARING METHANE-HYDROGEN FUEL WITH INCREASED HYDROGEN CONTENT FOR BOILER UNITS OF THERMAL POWER PLANTS AND GAS TURBINE EXPANDER POWER PLANTS | 2023 |
|
RU2813644C1 |
REGENERATIVE GAS-TURBINE EXPANSION UNIT | 2013 |
|
RU2549004C1 |
AUXILIARY POWER GAS TURBINE EXPANDER UNIT FOR COMPRESSOR STATIONS OF GAS-MAIN PIPELINES | 2013 |
|
RU2541080C1 |
COMBINED POWER GAS TURBINE EXPANDER UNIT OF MAIN LINE GAS PIPELINE COMPRESSOR STATION | 2018 |
|
RU2712339C1 |
COMPRESSOR STATION OF THE MAIN GAS PIPELINE WITH A GAS TURBO EXPANDER UNIT | 2021 |
|
RU2795803C1 |
Authors
Dates
2018-06-06—Published
2017-04-13—Filed