METHOD OF DRILLING REINFORCED CONCRETE COLUMN ERECTION Russian patent published in 2018 - IPC E02D5/38 

Abstract RU 2674480 C1

FIELD: construction.

SUBSTANCE: invention relates to the construction, in particular to the manufacturing technology of drilling reinforced concrete columns, and can be used to create pile foundations for underground and above ground multi-level buildings and structures for various purposes, including those erected in a semi-enclosed way in cramped conditions. Method of construction of the drill concrete column includes the formation of a well using a casing, the manufacture of the reinforcement cage of the column, the placement of the reinforcement cage of the column in the pipe. Casing pipe inclinometry is performed after drilling a well to the projected depth. Metal centralizers are welded to the pipe with the reinforcement cage of the column, wrapped in two layers of polyethylene, lowered into the casing, through the inner part of the reinforcement cage of the column, the concrete line is lowered and the concrete mix is placed with the accelerator setting to a height sufficient to fix the lower part of the reinforced concrete column. Raise the concrete pipe to a height of not more than the height of the concrete mix with the accelerator setting and stack the concrete mix with a retarder while raising the concrete pipe, embedded in the stackable mixture. Laid concrete mixture is kept up to a set of concrete mixture with an accelerator setting at the base of the column of minimum strength. Check the fixation of the reinforcement cage of the column and continue concreting to the design elevations while simultaneously removing the casing from the well and filling the annular space with a cement-sand mortar.

EFFECT: technical result consists in simplifying the method for erecting a drill concrete column and increasing productivity due to the absence of the need to center the reinforcement cage after lowering it in the casing.

1 cl, 2 dwg

Similar patents RU2674480C1

Title Year Author Number
DRILLING REINFORCED CONCRETE COLUMN AND METHOD FOR ITS CONSTRUCTION 2022
  • Yurkevich Pavel Borisovich
RU2798149C2
REINFORCED CONCRETE DRILLING PILE AND METHOD OF ITS ERECTION 2016
  • Yurkevich Pavel Borisovich
RU2657885C2
METHOD OF BRIDGE BUILDING OVER WATER BODY 2004
  • Kostylev V.V.
  • Sur E.G.
RU2237123C1
METHOD OF ERECTING PILED FOUNDATION DESIGNED FOR HIGH LOADS 2008
  • Bigvava Georgij Demurovich
  • Sepashvili Otar Dmitrevich
RU2375521C1
SCREW REINFORCED CONCRETE COLUMN AND BUILDING METHOD THEREOF 2003
  • Jurkevich P.B.
RU2229557C1
PIPE CONCRETE PILE WITH REINFORCED BASE AND METHOD OF ITS ERECTION 2011
  • Akatov Vjacheslav Pavlovich
  • Akatov Maksim Vjacheslavovich
  • Dankovtsev Aleksandr Fedorovich
  • Pudeev Pavel Vasil'Evich
  • Smirnov Aleksandr Jur'Evich
  • Politiko Dmitrij Leonidovich
  • Fedorashko Nikolaj Vasil'Evich
RU2492294C1
CONSTRUCTION METHOD FOR BRIDGE OR OVERPASS 2002
RU2251604C2
METHOD FOR CONSTRUCTING BRIDGE SUPPORT IN WATER AREA 2023
  • Konnykh Andrej Albertovich
  • Sukhorukov Aleksej Aleksandrovich
  • Romanov Dmitrij Vyacheslavovich
  • Kolyushev Igor Evgenevich
  • Lyutyj Sergej Mikhajlovich
  • Malygin Evgenij Gennadevich
RU2809049C1
METHOD FOR ERECTION OF BORED PILE WITH SOIL-CEMENT BROADENINGS IN WEAK SOILS ZONE AND DEVICE FOR ITS IMPLEMENTATION (VERSIONS) 2019
  • Mikhajlov Aleksandr Nikolaevich
  • Pushkarev Aleksandr Evgenevich
  • Sokolov Nikolaj Sergeevich
  • Sokolov Sergej Nikolaevich
  • Sokolov Andrej Nikolaevich
  • Savchuk Aleksandr Dmitrievich
RU2725363C1
METHOD FOR BORED AND CAST-IN-PLACE PILE FORMING IN GROUND HAVING SILTY INTERLAYERS 2004
  • Kurakin P.P.
  • Korotin V.N.
  • Onishchuk V.M.
  • Novikov A.N.
  • Solodukhin A.N.
  • Sokolov A.D.
  • Chalenko V.V.
RU2260653C1

RU 2 674 480 C1

Authors

Ilin Igor Valerevich

Markov Vladimir Andreevich

Klochanov Vitalij Mikhajlovich

Dates

2018-12-11Published

2017-10-27Filed