SCREW REINFORCED CONCRETE COLUMN AND BUILDING METHOD THEREOF Russian patent published in 2004 - IPC

Abstract RU 2229557 C1

FIELD: building engineering, particularly building in constrained space. SUBSTANCE: reinforced concrete column comprises upper support and lower foundation parts. Column also has case formed of reinforcement rods, which is built in concrete mixture and embedded members. Column is made in non-removable form. Maximum outer equivalent case diameter Dc is less than well diameter Dw by α computed from determined relation. Embedded members are arranged at upper support column part and located at mark levels of foundation plate and mark levels of floor slabs. Embedded members are formed as closed contours with stiffening ribs. Lower column part has bottom part and retainers. Method of reinforced concrete column building involves drilling well with Dw diameter in design position; deepening case of reinforcement rods in vertical direction such that gap P≥0.1 Dw is formed between case and well bottom; vertically centering case with eccentricity compensation; fixing upper part for horizontal movement prevention; moving case vertically downwards up to well bottom reaching; fixing case lower part by retainers; filling lower foundation part with concrete and inner part of non-removable frame of upper support column part. Well has diameter Dw≥Dc+2εr+2Δ+2τ. EFFECT: increased accuracy in vertical direction of building load-bearing foundation members, possibility of building construction in upwards and downwards directions relative ground level. 6 cl, 5 dwg

Similar patents RU2229557C1

Title Year Author Number
DRILLING REINFORCED CONCRETE COLUMN AND METHOD FOR ITS CONSTRUCTION 2022
  • Yurkevich Pavel Borisovich
RU2798149C2
SLOT-LIKE REINFORCED CONCRETE COLUMN AND ERECTION METHOD 2003
  • Jurkevich P.B.
RU2251608C1
REINFORCED CONCRETE DRILLING PILE AND METHOD OF ITS ERECTION 2016
  • Yurkevich Pavel Borisovich
RU2657885C2
METHOD OF DRILLING REINFORCED CONCRETE COLUMN ERECTION 2017
  • Ilin Igor Valerevich
  • Markov Vladimir Andreevich
  • Klochanov Vitalij Mikhajlovich
RU2674480C1
METHOD OF ERECTING PILED FOUNDATION DESIGNED FOR HIGH LOADS 2008
  • Bigvava Georgij Demurovich
  • Sepashvili Otar Dmitrevich
RU2375521C1
ERECTION METHOD OF LINED BUILDING 2018
  • Bolshakov Vladimir Vladimirovich
RU2694662C1
METHOD OF ACCELERATED BUILDING ERECTION USING METHOD OF SCREWDRIVER ASSEMBLY AND BUILDING FROM FACADE PANELS WITH DECORATIVE EXTERNAL FINISHING AND METAL FRAMEWORK 2016
  • Semenov Dakhir Kurmanbievich
RU2633602C1
UNIVERSAL HOUSE-BUILDING SYSTEM 2014
  • Khudyakov Sergej Aleksandrovich
  • Ajsvert Roman Vilgelmovich
  • Salvatore Porto
  • Dmitrusenko Mikhail Sergeevich
RU2585330C2
GLASS-TYPE FOUNDATION FOR COLUMN 2020
  • Ilin Nikolaj Alekseevich
  • Mordovskij Sergej Sergeevich
  • Panfilov Denis Aleksandrovich
  • Kireeva Nadezhda Aleksandrovna
RU2751106C1
COMBINED JOINT OF GIRDERS AND COLUMNS 2014
  • Shpeter Aleksandr Karlovich
  • Semenjuk Pavel Nikolaevich
  • Rodevich Viktor Viktorovich
  • Matveev Andrej Vadimovich
  • Arzamastsev Sergej Aleksandrovich
  • Konovalov Sergej Vladimirovich
RU2550624C1

RU 2 229 557 C1

Authors

Jurkevich P.B.

Dates

2004-05-27Published

2003-06-02Filed