FIELD: chemistry.
SUBSTANCE: invention relates to the field of electrochemical protection of pipeline transport, in particular to test equipment intended for testing anode earthing switches. Technical result is achieved due to the fact that the installation contains a cathodic protection station connected to the protected structures, grounding grounds with anodic groundings installed on them, terminal cabinet with terminal panel, the measuring connectors of which are connected to protective structures and test samples of anode earthing by cable lines, at the same time, the negative terminal of the cathodic protection station is connected to the group of protected structures interconnected by conductors using the first power cable line, and the positive terminal of the cathodic protection station is connected via resistive devices to the anode earthing via a second power cable line, at the same time, the anode earthing switches are located inside the dielectric screens.
EFFECT: technical result of the invention is to identify the optimal systems of anode earthing and increase the efficiency of electrochemical protection.
10 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
INSTALLATION FOR TESTS OF ELECTRODES OF COMPARISON IN MARINE CONDITIONS | 2017 |
|
RU2685459C1 |
INSTALLATION FOR CATHODIC PROTECTION CONTROL | 2021 |
|
RU2783858C1 |
METHOD FOR OPERATION OF PIPELINES OF OIL COLLECTION AND RESERVOIR PRESSURE MAINTENANCE OF OIL DEPOSIT | 2015 |
|
RU2593855C1 |
OPERATION METHOD FOR OIL DISCHARGE AND OIL RESERVOIR PRESSURE MAINTENANCE SYSTEMS | 2006 |
|
RU2303122C1 |
DEVICE FOR CONTROL AND SWITCHING OF REFERENCE ELECTRODES | 2021 |
|
RU2791539C2 |
METHOD FOR OPERATION OF PIPELINES OF OIL COLLECTION AND RESERVOIR PRESSURE MAINTENANCE OF OIL DEPOSIT | 2015 |
|
RU2588916C1 |
METHOD FOR JOINT WELL AND OIL PIPELINE USAGE | 2006 |
|
RU2303123C1 |
METHOD FOR CONSTRUCTION OF GAS PIPELINES AND/OR CONDENSED GAS PIPELINES, ENGINEERING EQUIPMENT AND COMPLEX OF OBJECTS FOR PRODUCTION AND TRANSPORTATION OF GAS AND METHOD OF OPERATION AND/OR REPAIR, AND/OR RECONSTRUCTION, AND/OR REBUILDING OF GAS PIPELINES AND/OR CONDENSED GAS PIPELINES AND ENGINEERING EQUIPMENT | 1995 |
|
RU2053432C1 |
METHOD FOR CATHODIC PROTECTION OF AN UNDERGROUND FACILITY | 2021 |
|
RU2768063C1 |
METHOD OF CATHODE PROTECTION OF CASING STRINGS OF WELLS AND OIL-FIELD PIPELINES AGAINST CORROSION | 2016 |
|
RU2636540C1 |
Authors
Dates
2019-02-04—Published
2017-10-11—Filed