FIELD: construction.
SUBSTANCE: method consists in the fact that snow in water before freezing is added in the amount of 40–60 % of the total mass, the mixture is intensively mixed until a homogeneous composition is obtained, compact, level the surface, remove from the form in an inverted state and freeze in a free state.
EFFECT: method for manufacturing a block (small-piece) building material on an ice basis is presented.
1 cl, 1 tbl
Title | Year | Author | Number |
---|---|---|---|
METHOD OF MAKING BLOCK (SMALL-PIECE) CONSTRUCTION MATERIAL FROM SNOW | 2018 |
|
RU2714543C1 |
METHOD FOR ERECTION OF ICE PLATFORM ON GROUND | 1995 |
|
RU2080440C1 |
METHOD TO ERECT ICE MOORAGE IN ARCTIC SEAS | 2012 |
|
RU2493324C1 |
METHOD OF CONSTRUCTING SNOW-ICE COVER ON GLACIAL DOMES OR ICE OF RESERVOIR | 2024 |
|
RU2824671C1 |
METHOD FOR CONSTRUCTION AND OPERATION OF SURFACE STORAGE FACILITY FOR SOLID TOXIC WASTE IN PERMAFROST ZONE | 2023 |
|
RU2806888C1 |
THREE-DIMENSIONAL STRUCTURE AND METHOD FOR CREATING DIFFERENT CLIMATIC CONDITIONS, PARTICULARLY COLD ONES, INSIDE THE STRUCTURE | 1999 |
|
RU2256048C2 |
PIER | 2013 |
|
RU2535726C1 |
METHOD OF CONSTRUCTION OF ICE DOCK OR ISLAND | 2018 |
|
RU2698888C1 |
METHOD FOR COVERING WINTER TIMBER ROAD | 2023 |
|
RU2811818C1 |
EARTHWORK ON PERMAFROST SOILS AND METHOD OF ITS ERECTION WITH BASE REINFORCEMENT IN AREAS OF PERMAFROST PROPAGATION | 2010 |
|
RU2443828C1 |
Authors
Dates
2019-04-17—Published
2018-02-28—Filed