FIELD: shipbuilding.
SUBSTANCE: invention relates to shipbuilding technology. Disclosed is a method for integrated construction and installation of equipment of upper floating unit of floating platform, which is carried out at a smart shipyard, which combines plant modules for sea construction and shipyard, and mainly comprising the following stages: step S1, on which construction of upper floating unit of floating platform, to create complete module of auxiliary facilities and module of process; step S2, on which the floating base upper technological unit is transported entirely to the integral assembly final assembly area; step S3, where assembled complete module of auxiliary means and module of technological process are mounted on ship hull by means of jacking system and shearing system; and step S4, on which the overall commissioning is performed.
EFFECT: invention allows to considerably reduce duration of works, reduce total construction costs, minimize number of operations with application of cranes and works at height, and reduce risks in construction.
10 cl, 10 dwg
Title | Year | Author | Number |
---|---|---|---|
MANUFACTURING METHOD FOR INTEGRATED INDUSTRIAL COMPLEX ON GRAVITY BASED STRUCTURE (GBS) | 2021 |
|
RU2757517C1 |
MOUNTING BASE RESTING ON SEABED AND METHOD FOR INSTALLATION THEREOF | 2017 |
|
RU2719645C1 |
OFFSHORE PRODUCTION COMPLEX FOR THE PRODUCTION, PREPARATION AND PROCESSING OF RAW GAS FOR THE PRODUCTION OF LIQUEFIED NATURAL GAS, A WIDE FRACTION OF LIGHT HYDROCARBONS AND STABLE GAS CONDENSATE BASED ON GRAVITY TYPE (GTB) | 2022 |
|
RU2779235C1 |
INTEGRATED PRODUCTION FACILITY BASED ON GRAVITY TYPE (GTB) | 2021 |
|
RU2762588C1 |
METHOD FOR CONSTRUCTION OF FLOATING STRUCTURES | 2010 |
|
RU2441799C2 |
METHOD OF UNIT BUILDING OF SHIP WITH PLUG-IN FREIGHT TANKS | 2011 |
|
RU2476346C1 |
METHOD FOR MANUFACTURING A GRAVITY-TYPE BASE (GTB) AT A SPECIALIZED PRODUCTION SITE | 2022 |
|
RU2771197C1 |
BOTTOM-BASED PLATFORM AND METHOD OF CREATING DRILLING TERMINAL FOR DRILLING IN SHALLOW-WATER SHELF | 2017 |
|
RU2719516C1 |
PROCESS OF CONSTRUCTION OF OFF-SHORE TECHNOLOGICAL COMPLEX FOR EXTRACTION OF MINERAL WEALTH | 2001 |
|
RU2219312C2 |
FLOATING STORAGE OF LIQUEFIED NATURAL GAS | 2015 |
|
RU2603436C1 |
Authors
Dates
2019-11-25—Published
2018-01-18—Filed