FIELD: oil and gas industry.
SUBSTANCE: invention relates to oil and gas production and can be used during repair of production wells by pumping of backfill composition into pores and rock cracks. Method comprises determining filtration and temperature parameters of disturbance interval, calculating optimum hardening time of two-component backfilling composition, production of a batch of two-component backfilling composition with specified properties, arrangement of tubing string in the well near the disturbance interval and pumping of the two-component backfill into the fault interval. Determination of disturbance interval parameters includes determination of temperature and permeability of disturbance interval. Optimal hardening time of the two-component backfill composition is calculated taking into account temperature and permeability of the fault interval. Pumping of two-component backfill composition is carried out taking into account composition hardening time till composition pressure reaches 25–30 MPa.
EFFECT: providing the possibility of sealing the water-bearing formation channels having different permeability nature, per one cycle of pumping of the two-component backfill composition.
1 cl
Title | Year | Author | Number |
---|---|---|---|
METHOD OF PRODUCTION STRING SEALING | 2013 |
|
RU2520217C1 |
METHOD OF BOTTOM WATER CONE CUTTING | 2016 |
|
RU2655490C2 |
METHOD OF RESTRICTING WATER PRODUCTION INTO OIL PRODUCING WELL | 2008 |
|
RU2370629C1 |
METHOD FOR DOING REPAIR-ISOLATION WORKS UNDER CONDITIONS OF INTENSE ABSORPTION | 2009 |
|
RU2405926C1 |
COMPOUND FOR ISOLATION OF WATER INFLOW AND ABSORBING ZONES IN WELL, AND ITS APPLICATION METHOD | 2011 |
|
RU2483093C1 |
METHOD OF PRODUCTION STRING SEALING | 2017 |
|
RU2669650C1 |
METHOD FOR ELIMINATING FLOWS BEHIND THE CASING IN A PETROLEUM PRODUCTION BOREHOLE FROM AN UNDERLYING AQUIFER | 2021 |
|
RU2776018C1 |
METHOD FOR SHUTOFF OF WATER INFLOW OF BOTTOM WATER IN GAS WELLS UNDER CONDITIONS OF ABNORMALLY LOW FORMATION PRESSURES | 1996 |
|
RU2121569C1 |
CASING ANNULUS PLUGGING METHOD | 2005 |
|
RU2286438C1 |
METHOD OF WELL'S HORIZONTAL BOREHOLE PART REPAIR INSULATION WORKS | 2008 |
|
RU2379472C1 |
Authors
Dates
2020-02-27—Published
2018-09-25—Filed