FIELD: underwater production of hydrocarbons.
SUBSTANCE: proposed group of inventions relates to receiving and distributing equipment. Modular underwater distribution unit of hydrocarbon production includes primary manifold and one or more number of jointly arranged expansion structures. Each of expansion structures is located within 100 meters from primary manifold. Primary manifold comprises first connections for connection with, at least, a riser and an umbilical from a surface installation and second connections for connection with at least one expansion structure. At least one expansion structure includes a secondary manifold, comprising first connections, connected to second connections of primary manifold, second connections for connection with at least one additional expansion structure and third connections for connection with at least well head and/or template plate. Hydrocarbon production system includes surface production platform connected by means of water-separating column and umbilical cable with distributing unit. System is configured to transmit electrical control signals, electric power and injected fluids into each of the wells, first through the primary manifold, and then through the secondary manifold. Disclosed is method of connection of wellhead with surface production platform by modular underwater distributing unit.
EFFECT: possibility of increasing the throughput capacity of the distribution unit as new wells are connected and maintaining reliability by optimizing the number of connecting elements.
14 cl, 9 dwg
Title | Year | Author | Number |
---|---|---|---|
SYSTEM FOR OFFSHORE PRODUCTION OF OIL OR GAS (VERSIONS), SHIP, OFFSHORE BOTTOM UNIT AND METHOD OF APPLICATION OF SAID SYSTEM | 1997 |
|
RU2191888C2 |
MOORING SYSTEM WITH SEPARATED ANCHOR LINES AND/OR MARINE RISER SYSTEM | 2010 |
|
RU2519456C2 |
UNDERWATER METHANE PRODUCTION PLANT | 2017 |
|
RU2736840C2 |
UNDERWATER WELL FLUID CONDITIONS TREATMENT | 2013 |
|
RU2668611C2 |
OFFSHORE WELL FOR OIL AND GAS RECOVERY WITH ABOVE-WATER PLACEMENT OF WELLHEAD EQUIPMENT | 2014 |
|
RU2566162C1 |
UNDERWATER TREATMENT OF WELLBORE FLUIDS | 2013 |
|
RU2638199C9 |
RISER BOOM | 2021 |
|
RU2776510C1 |
UNDERWATER PROCESS PLATFORM | 2019 |
|
RU2727206C1 |
SHIP USED FOR PERFORMING OPERATIONS IN UNDERWATER RUNNING WELL AND METHOD OF OFFSHORE DRILLING AT REDUCED HYDROSTATIC PRESSURE | 2000 |
|
RU2257456C2 |
METHOD OF CLEANING FLEXIBLE PIPELINES USING FLEXIBLE HOSE FROM FIELD DRILLING RIG | 2020 |
|
RU2818350C1 |
Authors
Dates
2020-05-18—Published
2015-12-18—Filed