FIELD: welding.
SUBSTANCE: invention relates to a method for one-sided welding of a pressure head or suction pipeline made of pearlitic steel with a cladding of austenitic steel with a thickness of 4 mm DN 800 of a contour of multiple forced circulation of power units with a RBMK-1000 reactor installation and can be used for welding when performing repair work to correct defects in welded joints pipelines DN 800. The method includes the stage of preparation for welding by cutting edges, the stage of assembling the joint for welding, the stage of welding the joint with filling the groove by manual argon-arc welding with filler wire by performing beads and the stage of tempering.
EFFECT: ensuring the reliability of the repair of DN 800 pipelines of the RBMK-1000 multiple forced circulation loop with a significant reduction in dose loads on the repair personnel, as well as ensuring the high quality of the welded joint.
1 cl, 7 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR WELDING STEEL TUBES WITH CORROSION-RESISTANT COATING | 1998 |
|
RU2155655C2 |
METHOD OF MULTIPASS AUTOMATIC ARGON-ARC WELDING OF PRODUCT OUT OF LOW ALLOYED STEEL OF PEARLITE CLASS WITH THICKNESS OVER 30MM | 2014 |
|
RU2574902C1 |
METHOD OF ARC WELDING OF WELDOLET FROM AUSTENITE STEELS TO PIPELINE FROM LOW-CARBON AND LOW-ALLOY STEELS | 2016 |
|
RU2643098C2 |
PREPARATION OF PIPE OR SHEET EDGES WITH PLATING LAYER FOR BUTT WELDING (VERSIONS) | 2013 |
|
RU2524472C1 |
METHOD FOR HYBRID LASER-ARC WELDING OF THICK-WALL PIPES | 2022 |
|
RU2787195C1 |
METHOD OF ARC WELDING OF COPPER AND COPPER-NICKEL ALLOYS WITH STEEL | 2011 |
|
RU2470752C1 |
METHOD OF FUSION WELDING OF CLADDED MATERIALS | 0 |
|
SU925574A1 |
METHOD OF WELDING OF BASE STRUCTURES MANUFACTURED OF ALUMINIUM ALLOYS | 1996 |
|
RU2089364C1 |
METHOD OF WELDING OF CAST-IRON PRODUCTS | 1996 |
|
RU2105646C1 |
METHOD FOR HYBRID LASER-ARC WELDING OF STEEL PIPES WITH OUTER LAYER OF PLATING | 2018 |
|
RU2684735C1 |
Authors
Dates
2021-11-11—Published
2021-01-14—Filed