FIELD: communication technology.
SUBSTANCE: to realise the technical result, the subscriber equipment receives a second configuration information transmitted by the base station and indicating whether the configuration of the subscriber equipment includes a preset function. Determines that the transmission of the scheduling request corresponding to the first logical channel in the uplink physical control channel and said other operation overlap in the time domain, this other operation can be suspended, and the scheduling request corresponding to the first logical channel can be transmitted via the uplink physical control channel so that the uplink resources requested by means of the scheduling request can be received to transmit a buffer status report at a maximum rate.
EFFECT: lower delay according to the requirements of the service corresponding to the first logical channel.
19 cl, 24 dwg
Authors
Dates
2021-12-28—Published
2018-04-04—Filed