METHOD FOR RESTRICTION OF BRINE WATER INFLOW TO PRODUCTION WELL Russian patent published in 2012 - IPC E21B43/16 

Abstract RU 2451165 C1

FIELD: oil and gas industry.

SUBSTANCE: method for restriction of brine water inflow to production well includes the following: perforation of production string against production zone followed by determination of formation pressures, creation of waterproof screen in upper part (additionally perforated via production string) of water-bearing zone by means of arrangement of insulation material in it, activation of formation fluids inflow, and oil production via flow column from well upon depression on production zone. Before activation of formation fluids inflow the following is performed: intervals of perforation of production and water-bearing zones are separated by packer installation in production string, additional pipe string is lowered till its lower part is tightly fixed in packer, additional pipe string is completely filled with insulation material. Density of chosen insulation material is to provide equivalence of insulation material column pressure and of pressure in water-bearing zone Insulation material is arranged in water-bearing zone by retraction upon depression on production zone.

EFFECT: increasing efficiency of isolation works.

1 dwg

Similar patents RU2451165C1

Title Year Author Number
METHOD OF LIMITATION OF PRODUCED WATER INFLOW TO PRODUCTION WELL 2016
  • Abdrakhmanov Gabdrashit Sultanovich
  • Khisamov Rais Salikhovich
  • Kadyrov Ramzis Rakhimovich
  • Khannanov Mars Talgatovich
  • Khasanova Dilbarkhon Kelamedinovna
RU2620670C1
METHOD OF CONDUCTING WATER-INSULATING WORKS IN THE EXTRACTING WELL, EXCLUDING THE WATER OIL DEPOSIT 2017
  • Leontev Dmitrij Sergeevich
  • Kleshchenko Ivan Ivanovich
  • Leonteva Natalya Alekseevna
  • Ponomarev Andrej Aleksandrovich
  • Aleksandrov Vadim Mikhajlovich
RU2661935C1
OPERATING METHOD OF WATER-FLOODED OIL FORMATION 2020
  • Nazimov Nafis Anasovich
  • Nazimov Timur Nafisovich
  • Emelianov Vitalii Vladimirovich
RU2724715C1
METHOD FOR INTENSIFYING THE PRODUCTION OF RESERVOIR PRODUCTS WITH BOTTOM WATER (OPTIONS) 2021
  • Nazimov Nafis Anasovich
  • Nazimov Timur Nafisovich
RU2769027C1
OIL DEPOSIT DEVELOPMENT METHOD 2002
  • Nor Aleksej Vjacheslavovich
  • Buslaev Viktor Fedorovich
  • Pjatibrat Vladimir Pavlovich
  • Vdovenko Vasilij Leont'Evich
  • Judin Valerij Mikhajlovich
RU2279539C2
METHOD OF OIL WELLS OPERATION 1998
  • Jaryshev G.M.
  • Murav'Ev P.M.
  • Jaryshev M.G.
RU2151276C1
PROCEDURE FOR ELIMINATION OF CROSS-FEEDS 2010
  • Khisamov Rais Salikhovich
  • Chupikova Izida Zangirovna
  • Afljatunov Rinat Rakipovich
  • Makarov Dmitrij Nikolaevich
  • Kamaliev Damir Sagdievich
RU2413840C1
METHOD OF SIMULTANEOUS-SEPARATE DEVELOPMENT OF SEVERAL PRODUCTIVE FORMATIONS AND WELL UNIT FOR METHOD EMBODIMENT 2001
  • Leonov V.A.
  • Sharifov Makhir Zafar Ogly
  • Donkov P.V.
  • Medvedev N.Ja.
  • Nichegovskij V.A.
  • Solovykh V.I.
  • Spivak T.S.
  • Khan G.B.
  • Shcherbakov V.P.
RU2211311C2
METHOD FOR DEVELOPMENT OF OIL DEPOSITS WITH LARGE DEPTHS OF PRODUCTIVE HORIZONS AND LOW WELL YIELDS 2019
  • Kovalev Adolf Appolonovich
RU2713547C1
METHOD TO ISOLATE CONE OF BOTTOM WATER IN GAS PRODUCING WELL 2020
  • Leontev Dmitrii Sergeevich
  • Tsilibin Vladislav Vitalevich
  • Bakirova Adelia Daniiarovna
RU2726668C1

RU 2 451 165 C1

Authors

Khisamov Rais Salikhovich

Abdrakhmanov Gabdrashit Sultanovich

Nuriev Il'Jas Akhmatgalievich

Taipova Venera Asgatovna

Chepik Sergej Konstantinovich

Dates

2012-05-20Published

2011-07-07Filed