FIELD: oil industry.
SUBSTANCE: method for constructing an underwater concrete block structure includes mounting a plurality of concrete blocks into a concrete block assembly, drilling a well in underwater soil under a hole in concrete of a concrete block assembly, and creating a concrete column in a hole in concrete and a drilled wellbore, thereby greatly increasing the stability of the subsea block concrete structure.
EFFECT: drilling a well from a dry site using drilling equipment placed on the top surface of a concrete block assembly increases productivity.
10 cl, 22 dwg
Title | Year | Author | Number |
---|---|---|---|
SYSTEM FOR SUBSEA OIL OR GAS FIELD DEVELOPMENT | 2013 |
|
RU2536525C1 |
METHOD FOR ERECTION OF BORED PILE WITH SOIL-CEMENT BROADENINGS IN WEAK SOILS ZONE AND DEVICE FOR ITS IMPLEMENTATION (VERSIONS) | 2019 |
|
RU2725363C1 |
DEVICE FOR WELL HOLE MAKING WITH WORKING FACE | 2008 |
|
RU2409734C2 |
METHOD OF PERFORMANCE OF OIL-GAS FIELD JOBS AND DEEP-WATER OFFSHORE PLATFORM FOR ITS EMBODIMENT | 1997 |
|
RU2140527C1 |
SYSTEM (VERSIONS) AND METHOD FOR NEAR-SURFACE LAYING OF UNDERGROUND CABLES OR UNDERGROUND LINES IN GROUND | 2016 |
|
RU2693805C2 |
METHOD FOR ERECTION OF BORED PILE IN SOIL-CEMENT COATING | 2019 |
|
RU2720047C1 |
METHOD OF CAST-IN-PLACE PILE MAKING | 2000 |
|
RU2193625C2 |
METHOD AND SYSTEM FOR CONTAINMENT OF UNCONTROLLED FLOW OF FLUIDS FLOWING FROM COLLECTOR TO ENVIRONMENT | 2011 |
|
RU2579062C2 |
METHOD FOR CONSTRUCTING DRILLED PILE IN PERMAFROST SOIL | 2023 |
|
RU2803751C1 |
TRENCHLESS PIPELINE LAYING METHOD AND PIPE FOR TRENCHLESS PIPELINE LAYING | 2021 |
|
RU2770531C1 |
Authors
Dates
2022-03-30—Published
2020-02-19—Filed