FIELD: construction.
SUBSTANCE: invention relates to the construction of a subway, and in particular to drainage devices for tunnels and underground workings, which serve to remove water from subway structures. SUBSTANCE: method for constructing a subway line with a dewatering plant includes constructing a lining of a distillation tunnel using a closed method for work using a tunnel boring complex and creating a cavity for placing a dewatering plant to remove water from the tunnel below the level of rail tracks intended for the movement of subway trains. When driving a distillation tunnel of the subway line with the help of a tunnel boring complex at the lower point of the subway line, a constructive deepening of the distillation tunnel is created due to the progress of the tunnel boring complex, in which, during the construction of a concrete base for laying rail tracks, a water intake cavity is formed and a drainage installation is placed in it, while in a concrete the base along the rail tracks form trays for draining water into the water intake cavity.
EFFECT: increasing the speed of construction of subway lines by closed method for work and reducing the amount of work to place a drainage installation on the subway line due to the absence of additional underground workings.
1 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR CONSTRUCTION OF METRO LINE USING TRENCHLESS METHOD WITH PERMANENT CROSS-SECTION CASING AND SINGLE TYPE OF TUNNEL-PENETRATING MECHANIZED COMPLEX | 2020 |
|
RU2754694C1 |
METHOD FOR CONSTRUCTION OF A SUBWAY LINE USING A LINING OF A LARGE DIAMETER CROSS-SECTION | 2022 |
|
RU2781850C1 |
DOUBLE-TRACK SUBWAY LINE WITH DEWATERING UNIT | 2021 |
|
RU2758251C1 |
SUBWAY LINE IN DEEP URBAN AREAS | 2023 |
|
RU2808273C1 |
SINGLE-VAULTED SUBWAY STATION ARRANGED IN DOUBLE-TRACK MAIN LINE TUNNEL | 2019 |
|
RU2701762C1 |
METHOD FOR ERECTING A THREE-SPAN METRO STATION WITH A DOUBLE-TRACK MIDDLE STATION TUNNEL AND SIDE STATION HALLS WITH PASSENGER PLATFORMS | 2022 |
|
RU2779168C1 |
METHOD FOR CONSTRUCTING A COLUMN OF A DEEP SUBWAY STATION | 2022 |
|
RU2785718C1 |
SINGLE-VAULT DEEP UNDERGROUND STATION WITH SUPPORTING TUNNELS, CONSTRUCTED BY A CLOSED METHOD FOR WORK | 2022 |
|
RU2785300C1 |
SINGLE-ARCH UNDERGROUND STATION CONSTRUCTED USING TUNNELING WITH SIDE PASSENGER PLATFORMS | 2022 |
|
RU2795011C1 |
METHOD FOR ERECTION OF THREE-VANE SUBWAY STATION OF CLOSED METHOD OF PERFOMING WORKS WITH DOUBLE-TRACK MAIN LINE TUNNEL | 2019 |
|
RU2704414C1 |
Authors
Dates
2022-05-12—Published
2021-08-31—Filed