FIELD: hydraulic structures.
SUBSTANCE: invention relates to hydraulic structures and is intended to protect settlements from floods during seasonal river floods. To achieve the effect, the following set of essential features is used: in the flood control dam, which is also constructed as well as the prototype, across the tributary of the main river with the possibility of forming a temporary reservoir in the flood formation zone and composed of large and small stones, unlike the prototype, the stones are laid in box-shaped gabions, installed in tiers and fixedly interconnected with the formation of a trapezoidal prism in the longitudinal section with a stepped bottom and vertical top faces, at the same time, gabions filled with large stones are installed in the lower tiers, located in the tributary below the level of a regular water flow, and gabions filled with small stones are installed in the upper tiers.
EFFECT: increase the life of the dam.
5 cl, 7 dwg
Title | Year | Author | Number |
---|---|---|---|
FLOOD-CONTROL FILTER DAM | 2014 |
|
RU2552361C1 |
METHOD FOR PROTECTION OF TERRITORIES AGAINST FLOODING IN RIVER BASINS | 2006 |
|
RU2389845C2 |
METHOD OF PREVENTING DAMAGE FROM FLOODING | 2019 |
|
RU2710164C1 |
METHOD TO PREVENT FLOODING OF AREA DOWNSTREAM DAM OF KRASNODAR WATER-ENGINEERING SYSTEM ON KUBAN RIVER | 2010 |
|
RU2440454C2 |
RESERVE SPILLWAY OF SOIL RETAINING STRUCTURE (VERSIONS) | 2014 |
|
RU2573328C2 |
METHOD FOR RIVER FLOW REGULATION TO PROVIDE FLOOD CONTROL | 2006 |
|
RU2304659C1 |
GROUND DAM BUILT ON PERMAFROST BASE | 2006 |
|
RU2309220C1 |
WEIR CONSTRUCTION METHOD | 2005 |
|
RU2321701C2 |
RIVER FLOW CONTROL METHOD | 2006 |
|
RU2306384C1 |
METHOD FOR FLOODING WATER RISE CONTROL | 2006 |
|
RU2312950C1 |
Authors
Dates
2022-07-21—Published
2021-12-29—Filed