FIELD: construction.
SUBSTANCE: dam is constructed on the tributaries of the main rivers with possibility of formation of temporary flood reservoir in the zone of flood formation and is laid across the inflow bed in the form of trapezoidal prism. Dam is made of waterproof bags with loose filler. Bags are stacked along the inflow bed in layers, with alternation of layers with longitudinal 6 and transverse 7 locations of bags relative to bed. The lower layer is formed of longitudinally disposed bags. In its turn, the longitudinal rows of bags are stacked at a distance from each other.
EFFECT: possibility of construction of flood-control dam in river beds of any configuration and in any geological conditions.
5 cl, 7 dwg
Title | Year | Author | Number |
---|---|---|---|
FLOOD DAM | 2021 |
|
RU2776485C1 |
METHOD FOR PROTECTION OF TERRITORIES AGAINST FLOODING IN RIVER BASINS | 2006 |
|
RU2389845C2 |
METHOD OF PREVENTING DAMAGE FROM FLOODING | 2019 |
|
RU2710164C1 |
METHOD FOR REGULATING WATER FLOW IN RIVER CHANNELS FOR PREVENTING FLOODS | 2017 |
|
RU2683224C1 |
PROCESS PREVENTING FLOODING OF ARABLE LAND BY FLOODWATER OF MOUNTAIN RIVER | 2002 |
|
RU2228996C1 |
METHOD TO PREVENT FLOODING OF AREA DOWNSTREAM DAM OF KRASNODAR WATER-ENGINEERING SYSTEM ON KUBAN RIVER | 2010 |
|
RU2440454C2 |
METHOD FOR PREVENTING OVERFLOW | 2004 |
|
RU2333312C2 |
METHOD FOR RIVER FLOW REGULATION TO PROVIDE FLOOD CONTROL | 2006 |
|
RU2304659C1 |
METHOD OF FLOOD PROTECTION | 2014 |
|
RU2547928C1 |
HALF-DAM | 2012 |
|
RU2581533C2 |
Authors
Dates
2015-06-10—Published
2014-03-05—Filed