FIELD: engine building.
SUBSTANCE: pre-heating system of the internal combustion engine (ICE) of the vehicle (1) contains a heat accumulator (3) connected through controlled valves to the ICE cooling circuit (1) and to household consumers (2), a heat exchanger and temperature sensors. The system additionally contains a heat pump (4) connected through controlled valves (7) to the internal combustion engine (1), to a heat accumulator (3) and to a heat exchanger designed as a box cooler (5). The box cooler (5) is built into the ship's hull with the possibility of taking seawater and converting it into a heat carrier.
EFFECT: increased amount of accumulated heat.
3 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
SYSTEM FOR PRE-STARTING HEATING OF INTERNAL COMBUSTION ENGINE | 2001 |
|
RU2211943C2 |
LIQUID-COOLED AUTOMOBILE ENGINE HEATER | 1999 |
|
RU2150604C1 |
SYSTEM TO MAINTAIN OPTIMUM HEAT CONDITIONS OF ICE | 2012 |
|
RU2488015C1 |
METHOD FOR COMPREHENSIVE UTILIZATION OF EXHAUST GAS ENERGY IN ENGINE-TRANSMISSION UNITS OF SELF-PROPELLED VEHICLES AND SYSTEM FOR ITS IMPLEMENTATION | 2022 |
|
RU2803593C1 |
SYSTEM FOR MAINTENANCE OF ICE OPTIMUM HEAT CONDITIONS | 2014 |
|
RU2573435C2 |
PRESTARTING HEATING SYSTEM OF INTERNAL COMBUSTION ENGINE AND HYDRAULIC DRIVE OF ROAD-BUILDING MACHINES | 2004 |
|
RU2258153C1 |
CITY BUS HEATING SYSTEM | 2001 |
|
RU2230929C2 |
METHOD OF AND SYSTEM FOR HEATING INTERNAL COMBUSTION ENGINE | 1999 |
|
RU2153098C1 |
DEVICE FOR PRE-START-UP HEATING THE DRIVE OF EXCAVATING- BUILDING MACHINE | 1994 |
|
RU2077639C1 |
DEVICE FOR PRESTARTING DELIVERY OF OIL INTO LUBRICATION SYSTEM OF INTERNAL COMBUSTION ENGINE | 2000 |
|
RU2182235C1 |
Authors
Dates
2023-03-21—Published
2022-12-21—Filed