FIELD: measuring equipment.
SUBSTANCE: technology can be used to determine the position of the centre of gravity of a massive and large-sized object by suspending it. The method involves hanging an object twice using a two-link system, in which the length of the primary slings changes between hangings, measuring the angles of deflection of the object and then calculating the coordinates of its centre of gravity. The suspension system is formed in such a way as to prevent loss of stability of the system and possible overturning and damage to the object in this case.
EFFECT: stability of the suspension system, prevention of the object from tipping over and damaging it, and simpler procedure for measuring and calculating the position of its centre of gravity.
1 cl, 6 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR DETERMINING THE CENTER OF GRAVITY OF THE PRODUCT BY SUSPENDING FROM THE POSITION OF THE TRAVERSE | 2021 |
|
RU2777341C1 |
METHOD OF DETERMINING POSITION OF CENTER OF GRAVITY OF MASSIVE ARTICLES | 2019 |
|
RU2721158C1 |
SLING SUSPENSION | 2012 |
|
RU2520681C1 |
METHOD OF TILTING LARGE-SIZED CYLINDRICAL CARGO | 2020 |
|
RU2742665C1 |
CROSSBEAM | 2012 |
|
RU2526308C2 |
CROSS BEAM OF HORIZONTAL JOINT, CROSS BEAM BALANCING MECHANISM LOAD SETTER, CROSS BEAM BALANCING MECHANISM LOAD VECTOR COMPENSATION UNIT AND METHOD OF ADJUSTING CROSS BEAM BALANCING | 2008 |
|
RU2374164C1 |
LOAD-GRIPPING DEVICE WITH SELF-RELEASE HOOK AND SELF-OPENING LOCK | 2003 |
|
RU2245291C2 |
METHOD OF AND DEVICE FOR BALANCING OF LOAD-LIFTING BOOM CRANE | 2005 |
|
RU2281242C1 |
METHOD FOR INCREASING TRAVELLING CRANE ACCURACY AND SPEED IN CARRYING CARGO OVER REQUIRED PATH | 2014 |
|
RU2564560C1 |
CANTILEVERED CROSSPIECE | 1991 |
|
RU2025446C1 |
Authors
Dates
2023-12-06—Published
2022-12-19—Filed