FIELD: construction.
SUBSTANCE: invention relates to a device for an auxiliary adjustable beam support for a building structure. The device is made in the form of a lower slab, which is laid on an unprepared or partially prepared, natural or artificial base, and in the form of an upper slab on which the beam rests. The top plate has a through hole into which a rod is inserted with a threaded connection with a nut on which the top slab rests. The slab level is adjusted by moving the nut. The rod is installed on the bottom slab, which can be attached to the base of the building structure, mainly soil. A method for quickly levelling a beam using an auxiliary adjustable support is proposed.
EFFECT: simplified design and ease of use.
10 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
RAIL THREAD MODULE AND METHOD OF ITS OPERATIONAL LAYING | 2022 |
|
RU2783010C1 |
UNDER-RAIL DEVICE AND METHOD FOR PROMPT RESTORATION OF A RAIL THREAD BY LEVEL | 2022 |
|
RU2786891C1 |
METHOD FOR TEMPORARILY RESTORING LEVEL OF RAIL THREAD, DEVICE FOR ITS IMPLEMENTATION, AND METHOD OF ASSEMBLING | 2023 |
|
RU2809413C1 |
RAPID-DEPLOYMENT RAILWAY TRACK AND METHOD FOR LEVELLING AND ALIGNING THE GAUGE THEREOF | 2022 |
|
RU2785239C1 |
UNDER-RAIL DEVICE OF A RAILWAY TRACK AND A METHOD OF LAYING AT LEAST ONE UNDER-RAIL DEVICE OF A RAILWAY TRACK | 2020 |
|
RU2746554C1 |
APPARATUS FOR MEASURING THE DISTANCE BETWEEN THE ROLLING STOCK, PRIMARILY A HOPPER-BATCHER, AND THE RAILWAY TRACK, AND METHOD FOR SETTING THE HEIGHT OF THE BATCHER OF THE HOPPER-BATCHER | 2021 |
|
RU2779434C1 |
METHOD FOR RAPID DEPLOYMENT OF RAILWAY TRACK AND CONSTRUCTION OF SUB-RAIL BASE | 2020 |
|
RU2750544C1 |
APPARATUS FOR MAKING REINFORCED CONCRETE BRIDGE BEAMS | 0 |
|
SU1652068A1 |
METHOD OF MANUFACTURE OF THE LENGTHY BUILDING STRUCTURES, THE LENGTHY BUILDING STRUCTURE AND THE COLUMN MANUFACTURED BY THIS METHOD | 2005 |
|
RU2288839C1 |
FIXED FORMWORK UNIT | 2018 |
|
RU2707117C1 |
Authors
Dates
2023-12-27—Published
2023-08-03—Filed