FIELD: bridge construction and repair. SUBSTANCE: invention can find use in repair and reconstruction of steel and steel-reinforced concrete bridges with one, two or more superstructures with water flow rate less than 100 cu m/s and viaducts. Process of reconstruction of beam bridge that has at least one superstructure includes dismounting of all superstructures, replacement of one superstructure with ground-filled structure. Novelty of approach lies in that ground-filled structure is mounted on existing pile trestles of superstructure with their subsequent joining. Existing trestles are shortened in points of ground-filled structure resting on them prior to mounting. Non-engaged trestles of superstructure are shortened when there is necessity to conduct mounting or ground filling operations for rebuilding of pavement of bridge and road. In this case frame-and-arched structure is utilized as ground-filled structure. EFFECT: development of more economic process of reconstruction of beam bridge with use of existing pile-trestle base. 2 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR BEAM BRIDGE RECONSTRUCTION | 2005 |
|
RU2302491C1 |
RING HIGHWAY OF MEGAPOLICE AND METHOD FOR ITS RECONSTRUCTION | 1998 |
|
RU2136803C1 |
METHOD OF OLD BRIDGE RECONSTRUCTION | 2002 |
|
RU2235165C2 |
MEGAPOLICE RING HIGHWAY AND METHOD FOR ITS RECONSTRUCTION | 1998 |
|
RU2136802C1 |
TRANSPORT COMPLEX OF MEGALOPOLIS AND METHOD FOR CONTROL AND RELIEF OF PASSENGER, FREIGHT - PASSENGER AND FREIGHT TRAFFICS OF MEGALOPOLIS TRANSPORT COMPLEX | 1998 |
|
RU2140480C1 |
TRANSPORTATION COMPLEX OF MEGAPOLICE AND METHOD FOR REGULATING AND RELIEVING PASSENGER, CARGO-PASSENGER AND CARGO TRAFFIC FLOWS IN IT | 1998 |
|
RU2135670C1 |
METHOD FOR RECONSTRUCTION OF STEEL AND REINFORCED CONCRETE SUPERSTRUCTURE OF BRIDGE | 1999 |
|
RU2142033C1 |
METHOD OF PIPE CULVERT REPAIR UNDER EMBANKMENT | 2004 |
|
RU2265692C1 |
METHOD AND APPARATUS FOR ASSEMBLING BRIDGE SPAN STRUCTURE FROM PREFABRICATED BLOCKS | 0 |
|
SU1307008A1 |
METHOD FOR BEAM BRIDGE RECONSTRUCTION (VARIANTS) | 2004 |
|
RU2271417C1 |
Authors
Dates
2004-03-20—Published
2003-03-26—Filed