FIELD: machine building.
SUBSTANCE: invention includes shank suspension system and method of its actuation. System includes a lowering tool. It also includes a shank hanger assembly connected to the lowering tool for transportation to the desired location in the wellbore. Shank hanger assembly includes a packer, a shank hanger configured to be actuated between a radially retracted position and a radially extended preset position due to application of pressure difference between internal pressure area and intermediate pressure area. It also includes a ball seat arranged to receive a ball blocking the connection between the internal pressure area and the intermediate pressure area to ensure the application of differential pressure. Also includes module of protection against premature installation. Module includes a locking mechanism installed on the shank suspension assembly and a bushing installed in the running tool. Locking mechanism is held in place by means of a bushing to block operation of the shank hanger. Bushing is made with possibility of displacement to release the locking mechanism in response to occurrence of pressure difference. System also includes a sealing sleeve located along the intermediate pressure area above the packer and a running tool section designed to facilitate initial pressure balancing between the internal pressure region and the intermediate pressure region to prevent premature release of the packer and running tool.
EFFECT: reduction and elimination of risk of premature actuation of shank suspension system and premature release of tool for running-in.
14 cl, 13 dwg
Title | Year | Author | Number |
---|---|---|---|
SYSTEM AND METHOD OF SECURING PIPE STRING IN WELL | 2020 |
|
RU2819314C2 |
ARRAY WITH BALL DROP AND METHOD OF ITS USAGE IN WELL | 2008 |
|
RU2491410C2 |
CONFIGURATION OF A RUNNER TOOL FOR RUNNING, ANCHORING AND SEALING THE SUSPENSION OF A LINER | 2020 |
|
RU2768861C1 |
CEMENTED LINER HANGER PACKER | 2021 |
|
RU2763156C1 |
SYSTEM AND METHOD FOR CONSTRUCTION AND COMPLETION OF MULTI-DOWNHOLE WELLS | 2019 |
|
RU2753417C2 |
RESERVOIR PRESSURE MAINTENANCE PACKER | 2024 |
|
RU2839160C1 |
DEVICE AND METHODS OF PACK-OFF OF UNDERGROUND WELL BORE AND EXECUTION ON CABLE OF OTHER BOREHOLE ROTATION OPERATIONS | 2010 |
|
RU2559255C2 |
METHOD FOR REPEATED MULTISTAGE HYDRAULIC FRACTURING IN A WELL WITH A HORIZONTAL TAILING-IN USING A CASING STRING OF A SMALLER DIAMETER | 2021 |
|
RU2775112C1 |
DRILLING WITH LINER USING A WITHDRAWABLE GUIDE ASSEMBLY OF THE BOTTOM | 2014 |
|
RU2671369C1 |
DEVICE FOR CASING LINER INSTALLATION IN WELL | 2009 |
|
RU2387807C1 |
Authors
Dates
2025-04-30—Published
2021-01-18—Filed