FIELD: building range. SUBSTANCE: a ground bed includes the main bank 2 and the additional bank 3. Pipelines and rest soil prisms 5, adjacent to the additional bank, are arranged in the additional bank 3. Strips of heat insulation material are placed in a base of the prisms 5. The additional bank is made of turf. EFFECT: enhanced reliability of ground bed. 1 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR BREAKING UNDERGROUND "WARM" PIPELINE IN PERMAFROST, WEAK SOIL IN CASE OF MELTING | 1988 |
|
SU1563323A1 |
EARTHWORK ON PERMAFROST SOILS AND METHOD OF ITS ERECTION WITH BASE REINFORCEMENT IN AREAS OF PERMAFROST PROPAGATION | 2010 |
|
RU2443828C1 |
GROUND BED FOR ROAD AND PIPELINES BREAKING IN PERMAFROST AREA | 1988 |
|
SU1700971A1 |
ROAD EMBANKMENT BUILT ON PERMAFROST GROUND | 2004 |
|
RU2256031C1 |
HEAT-SHIELDING SET FOR UNDERGROUND PIPELINE | 2008 |
|
RU2346199C1 |
MOTOR ROAD ON PERMAFROST SOILS | 2014 |
|
RU2551174C1 |
AUTOMOBILE ROAD ON PERMAFROST | 2015 |
|
RU2580549C1 |
METHOD FOR DRIVING A GAS MAIN IN MAN-MADE TRENCH AT PERMAFROST SOIL TERRITORY (VARIANTS) AND DEVICE FOR REALIZATION OF METHOD (VARIANTS) | 2006 |
|
RU2303736C1 |
METHOD FOR CONSTRUCTING SUBGRADE OF ADDITIONAL TRACK ON WEAK BASE IN CASE OF THAWING | 2021 |
|
RU2795020C1 |
ROAD EMBANKMENT OVER PERMANENTLY FROSEN SOILS | 2006 |
|
RU2324032C1 |
Authors
Dates
1995-09-10—Published
1985-02-27—Filed