THERMOMETRIC HOLE IN PERMAFROST GROUNDS Russian patent published in 1995 - IPC

Abstract SU 1385715 A1

FIELD: testing ground temperature. SUBSTANCE: thermometric hole in permafrost grounds has cased part with use of plastic pipe 4 with wood conical attachment 5 at its end and water-proof plug 8. Attachment 5 is located at least 1 m below the permafrost boundary, and casing-borehole annulus is filled with frozen filling material of local low-filtering ground. Filling material with water freezes up and expands to produce impermeable obstacle together with swelled attachment 5 for filtration of water layer of season thawing over walls. This prevents caving of hole walls. During measurement of temperature, thermometer is lowered into hole for time required for equalizing temperature of thermometer with that of hole, and lifted from hole to take readings. EFFECT: simplified process and cut down costs of hole construction and higher accuracy of measurement. 1 dwg

Similar patents SU1385715A1

Title Year Author Number
SHALLOW TUNNEL FORMED IN PERMAFROST GROUND 2004
  • Passek Vadim Vasil'Evich
  • Tsernant Aleksandr Al'Fredovich
  • Datskovskij Arkadij Khanan'Evich
  • Linnik Vladimir Aleksandrovich
RU2275471C1
RECULTIVATED SETTLING PIT 0
  • Papernov Iosif Markovich
  • Chaban Pavel Danilovich
  • Zamoshch Mikhail Naumovich
  • Komarov Petr Rommuelevich
  • Ageenkov Aleksandr Vasilevich
SU699102A1
DRAINAGE SYSTEM ON PERMAFROST SOILS 2015
  • Zhdanova Svetlana Mirzakhanovna
  • Tukmakova Oksana Viktorovna
  • Serenko Andrej Fedorovich
RU2618108C2
SHALLOW TUNNEL FORMED IN PERMAFROST GROUND 2004
  • Tsernant Aleksandr Al'Fredovich
  • Passek Vadim Vasil'Evich
  • Datskovskij Arkadij Khanan'Evich
  • Linnik Vladimir Aleksandrovich
RU2275472C1
EARTH ROAD BED ON PERMAFROST BASE 1999
  • Zhdanova S.M.
RU2160336C2
METHOD OF BUILDING OF PILE FOUNDATION AND PILE FOUNDATION 2007
  • Kruglov Valerij Mikhajlovich
  • Zenin Aleksandr Viktorovich
  • Vylitok Aleksandr Vasil'Evich
RU2348759C2
SUPPORT OF CONTACT NETWORK ERECTED ON SWELLING SOILS 2002
  • Kondrat'Ev V.G.
RU2209270C1
ARCH-TYPE FILLED BRIDGE 2003
  • Drobyshevskij B.A.
  • Mazur V.N.
  • Passek V.V.
RU2236498C1
PROCESS OF LAYING GAS PIPE-LINE IN PERMAFROST 1987
  • Kharionovskij V.V.
  • Borovkov V.A.
  • Mironov N.G.
  • Suvorov L.N.
  • Ivanov Ju.N.
  • Amelin G.S.
SU1438344A1
GROUND STRUCTURE ON PERMAFROST FOUNDATION 1992
  • Derbas V.A.
  • Zhdanova S.M.
RU2029813C1

SU 1 385 715 A1

Authors

Lugovoj P.N.

Minajlov G.P.

Dates

1995-04-30Published

1986-06-25Filed