FIELD: construction of railways. SUBSTANCE: machine has running gear on frame of which members for operation with intermediate rail fastenings and machine step-by-step travel drive are mounted. Step-by-step travel drive has carriage installed on guide secured along running gear frame and shaft with crank connected with hydraulic cylinder also installed on frame. Carriage is connected with shaft by means of additional crank and connecting rod. Drive has also clamp for engagement with head of rail of track along which running gear travels. Clamp has pair of levers to clamp rail head secured on carriage and connected by hydraulic cylinder. Spaces of hydraulic cylinder communicate with delivery or return main line of machine hydraulic control system through two-position four-line hydraulic control valve unit. EFFECT: enlarged operating capabilities. 3 cl, 5 dwg
Title | Year | Author | Number |
---|---|---|---|
RAIL TRACK INTERMEDIATE FASTENINGS NUT RUNNER | 1998 |
|
RU2154710C2 |
TRACK RAILS ENJOINING DEVICE | 1999 |
|
RU2180027C2 |
RAILWAY TRACK SKELETON DISASSEMBLING DEVICE | 1998 |
|
RU2154708C2 |
METHOD OF AND DEVICE FOR FASTENING RAIL TO TIE BASEPLATES | 2001 |
|
RU2216625C2 |
DEVICE FOR REMOVING HOOK BOLTS FROM REINFORCED CONCRETE TIES | 1991 |
|
RU2010078C1 |
DEVICE FOR SEPARATING RAILS FROM TRACK SKELETON | 1999 |
|
RU2167971C2 |
RAIL TRACK INTERMEDIATE FASTENING NUT RUNNER | 1998 |
|
RU2151834C1 |
DEVICE FOR FASTENING TIES TO PREVENT THEIR SPLINTING | 1998 |
|
RU2151835C1 |
RAIL TRACK INTERMEDIATE FASTENING NUT TURNING OFF DEVICE | 2000 |
|
RU2207426C2 |
CONTINUOUS LINE FOR REPAIR OF TRACK SKELETON LINKS | 2001 |
|
RU2210654C2 |
Authors
Dates
1995-07-25—Published
1992-01-09—Filed