FIELD: oil industry. SUBSTANCE: wells with closest interference with each other are identified. Producing wells with vertical and horizontal holes are located between these wells. Producing well horizontal holes are positioned perpendicular to direction between these wells. Additionally, one or more injection wells are located between these wells. Injection of driving medium is accomplished in cyclic mode. At the rest of injection wells, formation is drilled-in at roof, the injection pressure being comparable to overburden pressure. EFFECT: oil recovery from non-uniform reservoir increased. 3 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR DEVELOPMENT OF OIL FORMATION | 1994 |
|
RU2090742C1 |
METHOD FOR DEVELOPING OIL DEPOSITS | 2023 |
|
RU2812976C1 |
METHOD OF OIL DEPOSIT DEVELOPMENT | 2011 |
|
RU2439299C1 |
METHOD FOR INTENSIFICATION OF OIL RECOVERY | 1993 |
|
RU2066744C1 |
METHOD FOR DEVELOPMENT OF OIL AND GAS DEPOSIT AND OIL FRINGE | 1994 |
|
RU2085712C1 |
DEVELOPMENT METHOD OF PRODUCTIVE FORMATION WITH LOW-PERMEABILITY SECTION | 2012 |
|
RU2485291C1 |
METHOD OF DEVELOPMENT OF OIL DEPOSIT | 2011 |
|
RU2463443C1 |
MULTIPAY OIL DEPOSIT DEVELOPMENT METHOD | 2013 |
|
RU2530005C1 |
METHOD OF DEVELOPMENT OF OIL POOL | 1990 |
|
RU2088750C1 |
METHOD OF DEVELOPMENT OF OIL POOLS OBSTRUCTED BY EROSION TRENCH | 2007 |
|
RU2334087C1 |
Authors
Dates
1994-04-15—Published
1991-12-02—Filed