FIELD: repair of railway track. SUBSTANCE: machine has frame 2 resting on trucks 3. Mounted on frame 2 are power plant 7 and tool frame 14 of T-shape in plan. Cross beam of frame 14 rests on rails 4 of track 6 with help of rollers 22 provided with flange. Frame 14 is installed for moving along machine by means of drives 21. Cross beam of frame 14 is installed on its longitudinal beam for turning round vertical axis by drive. Installed on cross beam of frame 14 are working members 23 and driving rail clamps 26 for locking the machine to rails. EFFECT: higher efficiency. 8 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
SLEEPER TAMPING AND NIPPING MACHINE | 1988 |
|
RU2013483C1 |
TRACK PACKING UNIT OF TRACK MACHINE | 1991 |
|
RU2015239C1 |
DEVICE FOR INSTALLATION OF TOOL FRAME ON TRACK RAILS | 1991 |
|
RU2015240C1 |
TRACK-PACKING MACHINE FOR SWITCHES AND RAILROAD CROSSINGS | 1993 |
|
RU2062858C1 |
METHOD AND TIE TAMPER FOR COMPACTING RAILWAY TRACK RUBBLE | 1992 |
|
RU2048630C1 |
RAILWAY TRACK BALLAST CLEANER | 1992 |
|
RU2022074C1 |
MACHINE FOR TREATING BALLAST COURSE OR GROUND BASE OF RAILWAY TRACK | 1994 |
|
RU2093632C1 |
DEVICE FOR PLACING TOOLS FRAME ON RAILS | 1992 |
|
RU2035533C1 |
MACHINE FOR TRACK-LAYING OPERATIONS | 1995 |
|
RU2105835C1 |
SLEEPER PADDING MACHINE AND METHOD OF RAIL TRACK PADDING | 1994 |
|
RU2082847C1 |
Authors
Dates
1994-06-30—Published
1991-09-03—Filed