FIELD: mine working support. SUBSTANCE: screw-in anchor comprises stem 1 with screw thread. Installed on stem shank 4 is supporting member 2 with nut 3. Driven-in end of stem 1 has spring plug 5 with pitch equalling that of thread of stem 1. Spring plug is installed so that its one end is free, and the other is engaged with stop 6 attached between turns 7 of anchor stem 1. Anchor is screwed in hole 8 after introduction of setting grout 9. During rotation-translational motion of anchor, setting grout moves into face of hole 8 and solidification takes place. After screwing the anchor in hole, three zones of its fastening with enclosing rocks over hole length are formed. EFFECT: higher load carrying capacity of screw anchor is attained. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
ANCHOR FOR SUPPORTING OF UNDERGROUND WORKINGS | 1996 |
|
RU2112883C1 |
METHOD FOR SUPPORT OF MINE WORKINGS | 1992 |
|
RU2042032C1 |
METHOD OF SUPPRESSING DYNAMIC EFFECTS AT DEVELOPING COAL SEAMS | 1992 |
|
RU2034991C1 |
METHOD FOR DEGASSING ACCOMPANYING SEAMS | 1994 |
|
RU2065973C1 |
METHOD OF SUPPORT OF DEVELOPMENT WORKINGS | 1995 |
|
RU2079660C1 |
METHOD OF SUPPORT OF MINE WORKINGS AND DEVICE FOR ITS EMBODIMENT | 1995 |
|
RU2087720C1 |
METHOD FOR DEGASSING OF FOLLOWER-SEAM | 1995 |
|
RU2086773C1 |
METHOD OF CONTROL OF GAS EMISSION FROM WORKED-OUT SPACE | 1995 |
|
RU2100611C1 |
TEMPORARY SELF-ADVANCING UNYIELDING SUPPORT FOR MINE WORKINGS | 1995 |
|
RU2087721C1 |
MECHANIZED SUPPORT FOR LEAVING UNDERGROUND WORKINGS | 1995 |
|
RU2083845C1 |
Authors
Dates
1994-06-30—Published
1992-04-30—Filed