FIELD: construction. SUBSTANCE: method includes arrangement of end blocks of height not exceeding panel height, filling of binder in form of xylolith mass and exposure to vibration. After hardening of binder, closed through groove is made over perimeter of panel, and panel face is scraped and polished. EFFECT: higher efficiency. 5 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR BUILDING ROAD BED | 1992 |
|
RU2043455C1 |
TRAILING CABLE LAYER | 1991 |
|
RU2014405C1 |
METHOD OF AND DEVICE FOR DETERMINING HEAT CONDUCTANCE OF SOLID MATERIALS | 1992 |
|
RU2024013C1 |
METHOD OF LAYING ABOVE-GROUND PIPELINES ALONG MOTOR ROAD IN PERMAFROST areas | 1985 |
|
SU1295855A1 |
THREE-PHASE SEPARATOR | 1991 |
|
RU2020999C1 |
METHOD FOR PRODUCTION OF PARQUET SHIELDS | 1994 |
|
RU2074935C1 |
METHOD FOR FASTENING UNDERGROUND PIPELINES IN MELTING PERMAFROST GROUNDS | 1988 |
|
SU1565186A1 |
METHOD FOR CONSTRUCTION OF WATER DRAINAGE STRUCTURE | 1991 |
|
RU2025551C1 |
METHOD OF LAYING PIPE LINE IN PERMAFROST GROUND | 1983 |
|
SU1137849A1 |
METHOD OF UNDERGROUND PIPE LAYING | 0 |
|
SU1399561A2 |
Authors
Dates
1994-08-15—Published
1992-06-19—Filed