FIELD: hydraulic engineering works. SUBSTANCE: block frame is secured to bottom which is later used as pallet during formation of head block. Ready head blocks are carried to erection site, then position of piling wall profile is determined in plane in situ. Next, a cutout is made by templet in block bottom. Head block is eased down on wall until ribs come to design position, abutting against end of cutouts. Then the block cavity is reinforced and the head is concreted to the wall. EFFECT: higher efficiency. 4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR ERECTING REINFORCED CONCRETE HEAD OF A THIN WALL | 1991 |
|
RU2039148C1 |
DEVICE FOR ERECTING GROOVED AND TONGUED WALL | 1993 |
|
RU2054092C1 |
THIN RETAINING WALL | 0 |
|
SU1493715A1 |
METHOD OF ERECTING A GRAVITY STRUCTURE | 1991 |
|
RU2022084C1 |
METHOD FOR ERECTION OF GRAVITY WORKS IN WATER AREA | 1993 |
|
RU2048639C1 |
METHOD FOR ERECTION OF SHEET-PILE WALL AND DEVICE FOR ITS REALIZATION | 0 |
|
SU1793018A1 |
METHOD FOR MANUFACTURING A NEAR-CORDON BERTH BEAM | 2020 |
|
RU2745314C1 |
VERTICAL MOORING STRUCTURE | 1991 |
|
RU2014382C1 |
BERTHING STRUCTURE | 1996 |
|
RU2119004C1 |
HYDRAULIC STRUCTURE WITH VERTICAL PROFILE ON PILE BASE AND METHOD OF ITS ERECTION | 2014 |
|
RU2568497C1 |
Authors
Dates
1994-10-30—Published
1991-06-27—Filed