METHOD FOR ERECTING HEAD OF THIN SHEET PILING WALL Russian patent published in 1994 - IPC

Abstract RU 2022085 C1

FIELD: hydraulic engineering works. SUBSTANCE: block frame is secured to bottom which is later used as pallet during formation of head block. Ready head blocks are carried to erection site, then position of piling wall profile is determined in plane in situ. Next, a cutout is made by templet in block bottom. Head block is eased down on wall until ribs come to design position, abutting against end of cutouts. Then the block cavity is reinforced and the head is concreted to the wall. EFFECT: higher efficiency. 4 dwg

Similar patents RU2022085C1

Title Year Author Number
METHOD FOR ERECTING REINFORCED CONCRETE HEAD OF A THIN WALL 1991
  • Bekker A.T.
RU2039148C1
DEVICE FOR ERECTING GROOVED AND TONGUED WALL 1993
  • Bekker A.T.
  • Abramov V.E.
RU2054092C1
THIN RETAINING WALL 0
  • Bekker Aleksandr Tevevich
  • Sukharev Yurij Aleksandrovich
  • Andriyasov Sergej Mikhajlovich
SU1493715A1
METHOD OF ERECTING A GRAVITY STRUCTURE 1991
  • Bekker A.T.
RU2022084C1
METHOD FOR ERECTION OF GRAVITY WORKS IN WATER AREA 1993
  • Bekker A.T.
RU2048639C1
METHOD FOR ERECTION OF SHEET-PILE WALL AND DEVICE FOR ITS REALIZATION 0
  • Bekker Aleksandr Tevevich
SU1793018A1
METHOD FOR MANUFACTURING A NEAR-CORDON BERTH BEAM 2020
  • Zhelezkin Sergej Georgievich
RU2745314C1
VERTICAL MOORING STRUCTURE 1991
  • Bibel'Nik A.A.
  • Volodenkov V.F.
  • Bobr O.A.
RU2014382C1
BERTHING STRUCTURE 1996
  • Gorgutsa Ju.V.
  • Djachenko V.A.
  • Kljucharev N.D.
  • Zlatoverkhovnikov L.F.
  • Puzankov V.I.
RU2119004C1
HYDRAULIC STRUCTURE WITH VERTICAL PROFILE ON PILE BASE AND METHOD OF ITS ERECTION 2014
  • Bondarenko Vitalij Aleksandrovich
  • Kushu Ehduard Khadzhimosovich
  • Natsvin Dmitrij Olegovich
  • Vinogradov Aleksandr Sergeevich
  • Kolbanov Oleg Vladimirovich
RU2568497C1

RU 2 022 085 C1

Authors

Bekker A.T.

Dates

1994-10-30Published

1991-06-27Filed